BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Pigeon Forge, Tennessee. Completed plans call for the renovation of a water / sewer project.

*As of April 5, 2024 this project has not yet been awarded. A timeline for award has not yet been established.* Specifications may be obtained at the Public Works Department in City Hall between the hours of 8:00 and 4:30, Monday thru Friday. In general, this project consists of, but is not limited to, furnishing all necessary labor, materials, equipment, and incidentals to install a diesel-powered generator and automatic transfer switch for this three phase, 480-volt booster pump station. The station's main load is two 10 horse power (16 FLA) centrifugal pumps along with one 60 horse power (83 FLA) centrifugal pump. Actual size of generator to be determined by bidder. Pre-bid site visits by bidders are required to thoroughly examine existing conditions and acquaint themselves with the level of difficulty and any constraints, and to determine for themselves the level of effort required to successfully perform the work. For questions about generator specs or to schedule a visit contact Kevin or Ken at the Pigeon Forge Water Treatment Plant at 865-453-1275 between the hours 7:00 am and 3:30 pm

Award

Water / Sewer

$86,806.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
32
Bidding Soon
585
All Active Projects
237
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2024

April 29, 2024

img_map_placeholder

To Be Determined, Pigeon Forge, TN

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.