Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 5, 2025 at 7:00 PM
Updated March 6, 2025
Site work for a water / sewer project in Tamarac, Florida. Conceptual plans call for site work for a water / sewer project.
Update: https://www.tamarac.org/DocumentCenter/View/12410/FY2025-ADOPTED-Budget-ADA This project will provide for improvement of the wastewater force mains that are undersized for the current wastewater flow conditions that exist in several wastewater basins and will replace force mains that have significant corrosion. Impact on the operating budget is anticipated to be zero. Project is included in City of Tamarac Fiscal Year 2025-2030 Page no. 203 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- The project will replace the existing individual metal packaged filter units with a structural concrete housed filter unit with a capacity of 10 MGD. The filters are a critical component in the Water Treatment Plant's process of drinking water. There are six existing package filters with an approximated total capacity of 6.2 MGD and one Greenleaf filter with a capacity of 8 MGD. The existing filter package units have reached the end of their useful life and need to be replaced. The replacement of the package filters will provide the Water Plant with a reliable means of providing the required filtration at a greater capacity. The increased capacity will also be required in the very near future as the population of the City grows. The new 10 MGD filters will have the ability to provide the required capacity for at least another 30 years. It is anticipated that the impact on the operating budget is zero. The project is include in the city's 2024-2029 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Water / Sewer
$2,000,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2028
To Be Determined, Tamarac, FL
Related To This Project
Tamarac, FL
Bid Date: May 22 2025
Tamarac, FL
Bid Date: Sep 21 2021
Tamarac, FL
Bid Date: Aug 20 2020
Tamarac, FL
Bid Date: Mar 04 2021
Tamarac, FL
Bid Date: Feb 20 2019
Tamarac, FL
Bid Date: Jun 12 2025
Tamarac, FL
Bid Date: Jun 13 2025
Tamarac, FL
Bid Date: Jun 10 2025
Tamarac, FL
--
Tamarac, FL
--
Tamarac, FL
Bid Date: Feb 17 2025
Tamarac, FL
Bid Date: Feb 20 2025
Tamarac, FL
Bid Date: Feb 26 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
