BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 12, 2024 at 8:00 PM

Updated April 13, 2024

Site work for a playground / park / athletic field in Buchanan, Michigan. Working plans call for site work for a playground / park / athletic field.

**As of April 12, 2024 this project is not moving at this time. Scope of Work: 1. If required, remove existing fence for field access and reinstall upon completion. (by others) 2. Sewn seam install method 3. Tufted and inlaid lines and markings 4. Field Groomer; typical tow-behind - GreensGroomer w/ LitterKat 5. Eight (8) year manufacturer & installation warranty PROJECT CONDITIONS A. Existing Utilities: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted in writing by Owner, and then, only after arranging to provide temporary utility services according to requirements indicated below: 1. Notify Owner at least two days in advance of proposed utility locations The Work Prevailing Wages Project Turf Company awarded project shall furnish all necessary labor, materials, tools and equipment necessary to remove existing and install new synthetic turf resilient infill system. Accepts full responsibility for the Work and agree to complete the Work in strict accordance and full compliance with the terms o u t l i n e d i n t h i s RFP and the complete satisfaction of the Owner. Time Line The Turf Company awarded the project shall coordinate with the Project Manager to establish a construction schedule to commence work at a date agreeable for timely completion by Saturday, July 27th. Final project completion is Friday, August 2nd when all testing, owner walk-through and punch-list items shall be complete. Bonds Not required. Requests for additional Information shall be submitted via email to Greg Noorman, Project Manager, gregn@katerbergverhage.com and Chuck Albright, Turf Consultant, chuck@turfix.com by 5:00 PM, EST Thursday, March 28, 2024.

Final Planning

Playgrounds / Parks / Athletic Fields

$785,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
308
Active Projects
106
Bidding Soon
2,434
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2024

October 11, 2024

Project location map

401 W Chicago St, Buchanan, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.