BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 6, 2025 at 7:00 PM

Updated March 6, 2025

Site work and paving for a mixed-use development in Buchanan, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The City of Buchanan, Michigan is seeking qualified contractors to remove and replace an existing timber retaining wall located along E. Front Street across the street from The American Legion (403 E Front Street, Buchanan, MI 49107). The retaining wall is to be replaced with a 1'-0" wide reinforced concrete retaining wall tying into existing conditions. The scope of work also includes the demolition and replacement of the existing concrete sidewalk adjacent to the retaining wall, protection of existing curb, gutter and HMA roadway, installation of retaining wall railing, maintenance of traffic, erosion control measures, site clearing and restoration, local permitting measures and coordination allowances with the City of Buchanan for the construction of a banner pole base in conjunction with this project. Substantial Completion is scheduled for June 30, 2025. Question Deadline 01/03/2025 at 2:00 PM ET Technical questions shall be submitted to emoreno@jpr1source.com A pre-bid meeting is not planned or scheduled, but bidders are encouraged to visit the site prior to preparing/submitting a bid. Technical questions shall be submitted by Friday January 3, 2025 by 2 pm ET to emoreno@jpr1source.com The successful bidder will be required to furnish satisfactory performance bond as well as labor and material bond. For execution of the contract, a certified check or bidder's bond in an amount of not less than five percent (5%), made payable to the Owner, of the amount of the proposal will be required with each proposal. The City reserves the right to reject any or all proposals, to waive irregularities in proposals and to accept the proposal, which in the opinion of the Commission, best serves the interest of the City. No bid shall be withdrawn after the opening of bids for a period of thirty (30) days after the scheduled time of receiving bids.

Bid Results

Roads / Highways

$290,890.00

Public - City

Paving, Site Work

11

11

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
308
Active Projects
85
Bidding Soon
2,406
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 9, 2025

February 10, 2025

Project location map

403 E Front St, Buchanan, MI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.