Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 19, 2024 at 8:00 PM
Updated April 20, 2024
Site work and paving for a mixed-use development in Altoona, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
Pavement Replacement. The Work for Which Bids Are Requested Includes Removing Asphalt and Concrete Surface, Cabc, Preparation of Base Course, Concrete Driveway, Hma Pavement, Adjustments, Sawing, and Traffic Control. A 5% Bid Security is Required. The following street segments are included in the contract. 1. N Moonlight Dr - Water Tower road to 400 feet north 2. 11 th St W - Spooner Ave to Lynn Ave 3. 1 st St E - Lynn Ave to Bartlett Ave 4. Concrete Pedestrian Island Removal - 15'x66' removal and replacement with 6" of pavement (2 lifts) on 3 rd St E, intersection with Bartlett Ave 5. Bauer St Shop Parking Lot - south and north side of building replaced with 3" of MT HMA (2 lifts) 6. Altoona Library Parking Lot This includes removal of the existing asphaltic concrete pavement, removal and replacement of sanitary manhole castings, supplemental aggregate base course (if necessary), preparation of base course, and paving with three inches of asphaltic concrete. For questions regarding this project contact the Assistant Director of Public Works/City Engineer, 1303 Lynn Avenue, Altoona, WI 54720, telephone (715) 839-6092 or at christienh@ci.altoona.wi.us.
Award
Sidewalks / Parking Lot
$192,084.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
8
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 2, 2024
May 2, 2024
Multiple Locations, Altoona, WI
Related To This Project
Altoona, WI
Bid Date: Aug 20 2024
Altoona, WI
Bid Date: Jan 28 2025
Altoona, WI
Bid Date: Feb 25 2025
Altoona, WI
Bid Date: Mar 20 2025
Altoona, WI
Bid Date: Apr 08 2025
Altoona, WI
Bid Date: Apr 08 2025
Altoona, WI
Bid Date: Apr 24 2025
Altoona, WI
Bid Date: Apr 24 2025
Altoona, WI
Bid Date: Apr 02 2024
Altoona, WI
Bid Date: Apr 02 2024
Altoona, WI
Bid Date: Mar 26 2024
Altoona, WI
Bid Date: Feb 26 2024
Altoona, WI
Bid Date: Feb 26 2024
Altoona, WI
Bid Date: Jan 16 2024
Altoona, WI
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
