BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 15, 2024 at 8:00 PM

Updated October 31, 2024

Site work, paving and outdoor lighting for a mixed-use development in Altoona, Wisconsin. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

This project is funded in part by a Neighborhood Investment Fund grant. A 5% bid security is required. The work for which bids are requested includes the following : The Yard The project consists of development of a commercial and public plaza consisting of repurposed shipping containers. The work includes construction of foundations for the containers, driveway and parking area construction, sanitary sewer and services, water main and services, storm sewer, decorative area lighting, electrical service and communication conduit installation, site grading, gravel, concrete curb and gutter, concrete sidewalk and surfaces, concrete driveway approaches, asphaltic concrete pavement, and lawn restoration. Specific questions regarding the plans and specifications for this project shall be directed to David Walter at Short Elliott Hendrickson Inc., 10 N. Bridge Street, Chippewa Falls, WI 54729, 715.720.6277, e-mail dwalter@sehinc.com.

Award

Sidewalks / Parking Lot

$573,356.00

Public - City

Outdoor Lighting, Paving, Site Work

28

10

8

4

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
35
Bidding Soon
476
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2024

September 19, 2024

Project location map

211 Division St, Altoona, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.