BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 7, 2025 at 8:00 PM

Updated May 8, 2025

Site work and paving for a mixed-use development in Altoona, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of May 07, 2025, the project was awarded to Montana & Son Grading but the awarded amount is not available.** The Owner will notify the Contractor of the location of any water services to be replaced or repaired. The items will be located throughout the City. The Contractor will be required to begin work on all water services within seventy-two hours (3 days) after being notified by the Water Utility. The City will notify the Contractor of the location of the valves/hydrants to be replaced/repaired and determine the timeframe for valve or hydrant replacement. The Contractor will submit a schedule for completing the work assigned by the City within ten (10 days) of being notified of the hydrants and valves to be replaced or repaired. The schedule will be subject to the approval of the Water Utility. The Contractor shall complete all work before moving to another job. In the case of a severe leak or similar condition, when considerable damage is being done to the street or adjacent area or when public safety is a factor, the Contractor will be expected to begin work within 2-3 hours after notification from the Water Utility. All inspection and administration of this contract will be conducted by the City Water Utility. For questions regarding this project contact the Assistant Director of Public Works/City Engineer, 1303 Lynn Avenue, Altoona, WI 54720, telephone (715) 839-6092 or at christienh@ci.altoona.wi.us. City Wide Water Utility and Curb Replacement The work for which bids are requested includes replacement of water services, valves, hydrants, and surface restoration including roadway and curb sections.

Award

Water / Sewer

$97,045.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
1
Bidding Soon
405
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2025

May 8, 2025

Project location map

Multiple Locations, Altoona, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.