BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Harbor Springs, Michigan. Completed plans call for site work for a road / highway.

The Culvert replacement is expected to be completed between June 15, and August 1, 2024. The successful bidder is expected to install the guardrail after the E.C.R.C. has completed the culvert replacement and HMA paving. The Emmet County Road Commission Project Manager, Travis L. Horrocks will notify the successful bidder, approximately 3 to 4 weeks before the site is ready for guardrail. The work includes furnishing all labor, material, and equipment for the supply and installation of guardrail per the attached plans. The Emmet County Road Commission, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office the Secretary, Part 21, Nondiscrimination in Federally assisted programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively insure that in any contact entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Project Information: Job Location: M-119 - at Five Mile Creek Tributary (100' east of Five Mile Creek Road) 0.12 miles Type of Work: Guardrail Removal, Install New Guardrail and Traffic Control Project Dates: Project Start Date: Once Culvert work By Emmet County Road Commission is Complete. Project Completion Date: August 30, 2024 (All Project Items) Project Submittals: The following shall be submitted to the Road Commission Engineer for approval prior to project start: 1. Material Source List (MDOT Form 501) 2. Progress Schedule (must be submitted within 5 days of Contract award) 3. Damage Claim Program 4. Traffic Control Plan Upon project completion, the Contractor shall submit a written "Notice of Completion" to the Engineer. After the Engineer receives the Notice of Completion, the Engineer will inspect the project. The Engineer will provide a list of any deficient items (Punch List) to the Contractor. Final acceptance will only be issued when any deficient items are addressed to the satisfaction of the Engineer. Final acceptance will be provided to the Contractor in writing Project Scope The Culvert replacement is expected to be completed between June 15, and August 1, 2024. The successful bidder is expected to install the guardrail after the E.C.R.C. has completed the culvert replacement and HMA paving. The Emmet County Road Commission Project Manager, Travis L. Horrocks will notify the successful bidder, approximately 3 to 4 weeks before the site is ready for guardrail. The work includes furnishing all labor, material, and equipment for the supply and installation of guardrail per the attached plans Guardrail Removal: All guardrail removed is to be salvaged and become property of the E.C.R.C. The contractor shall remove, completely disassemble, and stack guardrail materials on pallets, or trailer (provided by E.C.R.C.). Payment for removal and salvaging shall be paid for as Guardrail, Rem (Ft).

Award

Roads / Highways

$28,928.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
12
Bidding Soon
136
All Active Projects
46
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2024

June 15, 2024

img_map_placeholder

M-119, Harbor Springs, MI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.