Site work, paving and outdoor lighting for a transportation facility in Pittston, Pennsylvania. Completed plans call for site work for a transportation facility; for outdoor lighting for a transportation facility; and for paving for a transportation facility.

As of May 1, 2024, this project has not yet been awarded. A timeline for award has not yet been established. Wilkes-Barre/Scranton International Airport, 100 Terminal Drive, Avoca, Pennsylvania, 18641. Project generally includes blasting for constructing embankment fill, subbase, paving, and electrical work at the extension of Taxiway B. Major items included in this work are maintenance and protection of traffic, FAA 401 asphalt pavement, FAA P-209 crushed aggregate subbase course, airfield lighting and signage, erosion and sediment control, and pavement markings. Installation of Taxiway B Extension Paving and Lighting withing the Runway Safety Area (RSA) All bids must be accompanied by a Proposal Surety (Bid Bond or other instrument as described in the Instructions to Bidders) in the amount of five percent (5%) of the amount of the bid. Bidders must supply all the information required by the proposal forms. From the time of advertising until the actual bid opening for this Contract, all prospective Bidders, Contractors, Subcontractors, and Suppliers shall direct all technical inquiries related to this project to Mr. Steve Lange, Project Manager, McFarland Johnson, Inc., 607-723-9421, or slange@mjinc.com. The deadline for submitting inquiries related to this project is Wednesday, April 10, 2024, at 12:00 p.m. (Noon). Minimum hourly wage rates shall be paid per the wage rate determinations of the Federal Davis-Bacon Wage Rate Act. The Disadvantaged Business Enterprise overall participation goal for Wilkes-Barre/Scranton International Airport is 4.5%: as determined by PennDOT Bureau of Aviation. Contractors shall make a good faith effort to employ minorities and women businesses as part of the project work. Wilkes-Barre/Scranton International Airport does not discriminate on the basis of race, color, national origin, sex, religion, age, disability or familial status in employment or the provision of services. Wilkes-Barre/Scranton International Airport is an Equal Opportunity/Affirmative Action Employer. PROJECT FUNDING: The project is being funded in part by the Federal Aviation Administration's (FAA) Airport Improvement Program, and the Pennsylvania Department of Transportation Bureau of Aviation. However, due to the timeline of FAA funding, the project construction work may not commence until the Spring of 2025. The Wilkes-Barre/Scranton International Airport reserves the right to reject any and all bid Proposals, to waive any informality in bid Proposals received, and to make awards in the best interest of Luzerne and Lackawanna Counties. WBE (6.9%) Completion- 90 Calendar Days

Award

Transportation Terminals

$6,691,500.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

84

10

12

4

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
159
Active Projects
64
Bidding Soon
1,182
All Active Projects
561
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2024

May 17, 2024

img_map_placeholder

100 Terminal Rd, Pittston, PA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.