Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a mixed-use development in Gurnee, Illinois. Working plans call for site work for a swimming pool.
As of April 17, 2024 bids were rejected, no definite date for the rebid. Separate sealed bids are sought for HUNT CLUB PARK AQUATIC CENTER FENCING 2024, for Gurnee Park District. HUNT CLUB PARK AQUATIC CENTER FENCING 2024 must be completed between May 1, 2024 through July 1, 2024. Work to include but not be limited to removal of existing board on board fencing, existing posts and concrete footings. Installation of new concrete footings, black vinyl coated posts, rails, mesh chain link and hardware, site restoration and all appurtenant construction necessary to complete the project. Gurnee Park District reserves the right to reject any and all bids and bidders and waive all technicalities. All proposals submitted will be valid for a period of sixty (60) days. Gurnee Park District reserves the right to award all or any portion of these bids. Bid Bond - An amount equal to 10% of the bid price in the form of a bid bond, certified check, or cashier's check made payable to Gurnee Park District shall be submitted with each bid; personal checks will not be accepted. Performance Bond and Labor and Material Bond - The successful bidder shall be required to provide a Performance Bond and Labor and Material Payment Bond for 100% of the awarded contract price within ten (10) days of notification of the contract award. The cost of the bond is to be included in the Bid Proposal. The Performance Bond and Labor and Material Payment Bond will become a part of the Contract. Each Bidder shall list the name of the surety company that will be furnishing the Bonds on its Bid Proposal. The failure of a Bidder to list the name of its surety company on its Bid Proposal shall be a non-responsive bid. The failure of the successful Bidder to enter into a Contract and supply the required Bonds within ten (10) days after the Notice of Award or within such extended period as the Owner may grant if the forms do not meet its approval, shall constitute a default, and the Owner may either award the Contract to the next responsible, responsive Bidder or re-advertise for bids. A charge against the defaulting Bidder may be made for the difference between the amount of the bid and the amount for which a contract for the work is subsequently executed, irrespective of whether the amount thus due exceeds the amount of the bid guarantee. Within 10 days of Notice of Award, the successful bidder must provide the owner with copies of its policies and programs regarding sexual harassment, substance abuse prevention, job site safety and employment discrimination.
Final Planning
Swimming Pools
$225,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 8, 2024
October 17, 2024
900 Hunt Club Rd, Gurnee, IL
Related To This Project
Gurnee, IL
--
Gurnee, IL
Bid Date: May 06 2024
Gurnee, IL
Bid Date: May 01 2024
Gurnee, IL
Bid Date: May 14 2024
Gurnee, IL
Bid Date: May 13 2024
Gurnee, IL
Bid Date: Mar 05 2021
Gurnee, IL
Bid Date: Jun 27 2024
Gurnee, IL
Bid Date: Apr 22 2024
Gurnee, IL
Bid Date: Apr 08 2024
Gurnee, IL
Bid Date: Apr 08 2024
Gurnee, IL
Bid Date: Apr 25 2024
Gurnee, IL
Bid Date: Apr 25 2024
Gurnee, IL
Bid Date: Apr 18 2024
Gurnee, IL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.