Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 30, 2024 at 8:00 PM
Updated May 1, 2024
Site work and paving for a mixed-use development in Skippack, Pennsylvania. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
**As of April 30, 2024, Project has been awarded. Award amount is $787,432.60** 2024 Skippack Road Improvements Project. Bids Shall Be Submitted in a Sealed Envelope and Shall Be Marked Clearly as Follows: Sealed Bid - Proposal for 2024 Skippack Road Improvements Project. Requirements for a 10% Bid Bond, 100% PerforMance Bond, and 100% PayMent Bond Are Included in the Contract Documents. Prevailing State Wage Rates and Public Works Employ- Ment Verification Act Will Ap- Ply on This Project. The Work Along Roadways Will Include: Township Line Rd - Traffic Control, Mobili- Zation, Core Samples, 1 1/2" Milling (3,800 Sy), 5" Base Repair 25mm (60 Sy), Leveling Course (20 Tons), 1-1/2" Wear- Ing Course 9.5mm (3,800 Sy); Pine Ln - Traffic Control, Mo- Bilization, Core Samples, Re- Move & Replace Ada Ramps (3 Ea), Remove and Replace Curb (60 Lf), 1 1/2" Milling (1,550 Sy), 5" Base Repair 25mm (30 Sy), Leveling Course (20 Tons), 1-1/2" Wearing Course 9.5mm (1,550 Sy); Serenity St Traf- Fic Control, Mobilization, Core Samples, Remove & Replace Ada Ramp (6 Ea), Remove & Replace Curb (120 Lf), 1 Milling (9,540 Sy), 5" Base Re- Pair 25mm (90 Sy), Leveling Course (40 Tons), 1-1/2" Wear- Ing Course 9.5mm (9,540 Sy); Hudnut Rd - Traffic Control, Mobilization, Core Samples, 1 " Milling (1,920 Sy), 5" Base Repair 25mm (1,400 Sy), Level- Ing Course (20 Tons), 1-1/2" Wearing Course 9.5mm (1,920 Sy); Abby Ln - Traffic Control, Mobilization, Core Samples, 1 " Milling (2,310 Sy), 5" Base Repair 25mm (30 Sy), Level- Ing Course (20 Tons), 1-1/2" Wearing Course 9.5mm (2,310 Sy), Remove Trench Drain; Dogwood Ln - Traffic Control, Mobilization, Core Samples, 1 1/2" Milling (3,550 Sy), 5" Base Repair 25mm (60 Sy), Leveling Course (40 Tons), 1-1/2" Wearing Course 9.5mm (3,550 Sy); Store Rd - Traffic Control, Mobilization, 1 1/2" Milling (120 Sy), 1-1/2 Wear- Ing Course 9.5mm (120 Sy); Pheasant Ln - Traffic Control, Mobilization, Core Samples, 1 12" Milling (3,340 Sy), 5" Base Repair 25mm (1,100 Sy), Level- Ing Course (60 Tons), 1-1/2" Wearing Course 9.5mm (3,340 Sy); Hidden Forest Dr - Traf- Fic Control, Mobilization, Core Samples, 1 Milling (9,976 Sy), 5" Base Repair 25mm (1,500 Sy), Leveling Course (100 Tons), 1-1/2" Wearing Course 9.5mm (9,976 Sy), Remove/replace Ada Ramp (4 Ea), Remove/replace Curb (80lf); Appaloosa Dr - Traf- Fic Control, Mobilization, Core Samples, 1 1/2" Milling (7,713 Sy), 5" Base Repair 25mm (200 Sy), Leveling Course (60 Tons), 1-1/2" Wearing Course 9.5mm (2,713 Sy), Remove/ Replace Ada Ramp (2ea), Re- Move/replace Curb (40 Lf); Palomino Dr - Traffic Control, Mobilization, Core Samples, 1 " Milling (1,557 Sy), 5" Base Repair 25mm (200 Sy), Level- Ing Course (60 Tons), 1-1/2" Wearing Course 9.5mm (1,557 Sy), Remove/replace Ada Ramp (2 Ea), Remove/replace Curb (40lf). Each Bidder Must Deposit With His Bid, Security in the Amount, Form and Subject to the Conditions Provided in the Instruction to Bidders. The Township of Skippack Re- Serves the Right to Reject Any or All Bids, and to Make Such an Award as Appears Most Ad- Vantageous to the Township.
Award
Sidewalks / Parking Lot
$787,432.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 9, 2024
June 1, 2024
Multiple Locations, Skippack, PA
Related To This Project
Skippack, PA
Bid Date: Apr 09 2024
Skippack, PA
Bid Date: Sep 12 2024
Skippack, PA
Bid Date: Sep 11 2024
Skippack, PA
Bid Date: Dec 10 2024
Skippack, PA
Bid Date: Mar 04 2025
Skippack, PA
Bid Date: Mar 04 2025
Skippack, PA
Bid Date: Jun 06 2025
Skippack, PA
Bid Date: Dec 09 2025
Skippack, PA
Bid Date: May 09 2024
Skippack, PA
Bid Date: Aug 10 2020
Skippack, PA
Bid Date: Nov 15 2023
Skippack, PA
Bid Date: Apr 20 2023
Skippack, PA
Bid Date: Apr 11 2023
Skippack, PA
Bid Date: Apr 13 2022
Skippack, PA
Bid Date: Nov 09 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
