Published May 9, 2024 at 8:00 PM

Updated May 10, 2024

Renovation of a power facility in Harlan, Iowa. Completed plans call for the renovation of a power facility.

a. Furnish labor and materials as required. b. Replace existing panel meters and data concentrators at four substations and two generator enclosures with new meters and data concentrators. c. Perform testing as required to verify correct wiring and installation of meters and data concentrators. d. Download relay settings from SEL relays and make minor modifications to relay logic, port settings, and etc. e. Assist Master Station Engineer personnel during metering system point checks for each device scanned by the master station. The work will generally be completed during the time period between July 22 and October 21, 2024. Plans and specifications may be obtained from P&E Engineering Co., by contacting Jared Kline at 515-558-8414 or by email at jakline@peengr.com. Bidding documents may be obtained electronically at no cost. A single copy of the Bidding documents in paper form may also be obtained at no cost from the Engineer Question Deadline 04/30/2024 Bidder shall submit all questions about the meaning or intent of the Bidding Documents via email to jakline@peengr.com Questions received less than seven days prior to the date for opening of Bids may not be answered.

Post-Bid

Power Plant

$350,000.00

Public - City

Renovation

134

12

2

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Closeout Submittals, Warranties, Commissioning
Division 08 - Openings

Division 08 - Openings

Hardware
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Compartments and Cubicles, Cubicles
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Medium-Voltage Electrical Distribution, Low-Voltage Electrical Distribution
Division 33 - Utilities

Division 33 - Utilities

Electrical Utilities, Utility Substations, Substation Control Wiring, Communications Utilities, Communications Distribution
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
17
Bidding Soon
483
All Active Projects
167
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 9, 2024

July 22, 2024

img_map_placeholder

To Be Determined, Harlan, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.