BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 16, 2024 at 8:00 PM

Updated July 17, 2024

Demolition, site work, paving, remodeling, renovation and addition to a mixed-use development in Harlan, Iowa. Completed plans call for the addition of a 28,000-square-foot, two-story above grade medical facility; for the demolition of a medical facility; for the renovation of a medical facility; for site work for a medical facility; for paving for a medical facility; for the remodel of a medical facility; sidewalk / parking lot; and sidewalk / parking lot.

Myrtue Medical Center in Harlan Iowa will be expanding its Rural Health Clinic with a two-story ~28,000 SF addition, the footprint of the building being 14,000 SF. This initial bid letting is intended to include the site work, site utilities, aggregate piers, site paving, foundations and some limited Mechanical and Electrical enabling work to allow the site work to begin this summer with the remaining building package to be bid later in early September 2024. Address: 1213 Garfield Avenue Harlan, Iowa 51537 Bid Security: N/A Project Start: August 8, 2024 Project Completion: All Work - December 22, 2025 Contact Information: For any questions, please contact: Contact Name: Nathan Blong, Project Engineer Phone Number: (515) 802-2796 Email Address: nblong@murray-company.com

Post-Bid

Medical

$21,000,000.00

Public - State/Provincial

Addition, Demolition, Paving, Remodeling, Renovation, Site Work

20

9

38

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
153
Active Projects
104
Bidding Soon
1,044
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 16, 2024

August 8, 2024

Project location map

1213 Garfield Ave, Harlan, IA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.