BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Lakeland, Georgia. Completed plans call for the renovation of a educational facility.

Proposals are advised that this work must be completed and ready to occupy by August 1,2025. A liquidated damages penalty of $1,000.00 per day will be imposed if the completion of the project extends beyond that date since the Owner would experience damages due to his inability to occupy the building. No proposals may be withdrawn lor a period of thirty (30) days after the scheduled time for receiving the proposals. Proposals must he accompanied by a proposal bond in an amount of not less than five (5) percent of the proposal. A Contract Performance Bond and Payment Bond equal to one hundred ( 100) percent of the contract price will be required of the successful proposer prior to start of construction. '! he Owner reserves the right to reject any or all proposals, to waive informalities and to re-advertise Contract will be awarded to the responsible and responsive offeror whose proposal is determined in writing to be the most advantageous to the Lanier County Board of Education, taking into consideration the evaluation factors set forth in the Proposal Form the Project Manual. The Construction Manager shall propose a Guaranteed Maximum Price (Ci. M. P.) complete with all cost, based on Plans and Specifications. This will be a Construction Manager Services Contract "at Risk". The selected CM will be issued a contract to provide "pre-construction services". The CM will coordinate and provide value engineering input to the Architect during the development and completion of final Construction Documents. He will be paid a fee of $5.000.00 for pre-construction services. Upon completion of final Construction Documents by the Architect and subsequent approval of same by Lanier County Board of Education ami Georgia Department of Education Facilities Section, The CM will be issued a contract to construct the renovated building based on a G. M. P. The G. M. P. will include all cost from the CM to the Owner based on final Documents. Payment will be made to the C M. on a monthly basis as work progresses.

Post-Bid

Educational

$6,600,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
11
Bidding Soon
393
All Active Projects
183
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2024

May 28, 2024

img_map_placeholder

Multiple Locations, Lakeland, GA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.