Demolition, site work and new construction of a civil project in Lakeland, Georgia. Completed plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; and for site work for a water / sewer project.

As of August 5, 2025, this project has not yet been awarded. A timeline for award has not yet been established. Work will include removal of existing Electrical Motor, Vertical Turbine Pump, Column Pipe, Bowl Assembly, and other appurtenances necessary to perform cleaning and video inspection of Ex. 10" Well Casing. Work will also include furnishing all products and performing all labor necessary to install a 100-HP, 650 GPM Vertical Turbine Pump, Construction of a New Chemical Feed Building, demolition of the existing Chemical Feed Building, yard piping, installation of +/- 850 LF of 12" Water Main. Construction shall also include logging and performing a 24-hour pump test, site work, electrical, valves, painting, fencing, and all other appurtenances necessary to complete the work. Time allotted for Construction will be 360 calendar days. Contact Carter & Sloope, Inc. for full advertisement. All other questions may be directed to the issuing office, Carter & Sloope, Inc., 6310 Peake Road, Macon, GA, 31210, Phone: 478-477-3923. No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) days except as specifically may be provided in the Instructions to Bidders and/or by State law. The Work will be awarded in one (1) Contract. The Scope of Work as described herein is defined as "utility contracting" in accordance with O.C.G.A 43-14-2(17) so the Contractor performing the work must provide proof of a valid license by the State of Georgia as a "Utility Contractor" and must also employ a "Utility Manager" certification holder who will have oversight of all utility the work. Therefore, the Contractor submitting a bid must list the license number of the Contractor performing the utility contracting on the face of the bid envelope and on the bid. No bid will be opened unless it contains the Contractor's Utility License Number on the envelope. See Instruction to Bidders for additional bidding requirements. Bids shall be accompanied by a bid bond or certified cashier's check in an amount not less than 10% of the base bid. All bonds shall be by a surety company licensed in Georgia with an "A" minimum rating of performance and a financial strength of at least five (5) times the contract price as listed in the most current publication of "Best's Key Rating Guide Property Liability". Performance and Payment Bonds, each in an amount equal to 100% of the contract price shall be required of the successful bidder if contract is awarded. Each Bond shall be accompanied by a "Power of Attorney" authorizing the attorney-in-fact to bind the surety and certified to include the date of the bond. All easements and rights-of-way for permanent installations have been obtained or will be obtained by the Owner prior to issuing the Notice to Proceed. All qualifying Contractors and Subcontractors performing work with the City of Lakeland must register and participate in the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, to verify the work eligibility information of new employees. In order for a Bid to be considered, it is mandatory that the Bidder's Affidavit of Compliance with O.C.G.A. 13-10-91 be completed and submitted with the Bid. Owner reserves the right to reject any or all Bids, including without limitation, the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner. Question Deadline 06/03/2025

Bid Results

Water / Sewer

$1,341,717.00

Public - City

Demolition, New Construction, Site Work

26

26

4

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
1
Bidding Soon
295
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 10, 2025

July 10, 2025

Project location map

Multiple Locations, Lakeland, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.