Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 16, 2025 at 8:00 PM
Updated July 9, 2025
Demolition, site work, new construction and renovation of a mixed-use development in Lakeland, Georgia. Completed plans call for the demolition of a educational facility; for the construction of a educational facility; for the renovation of a educational facility; for site work for a educational facility; pre-engineered storage facility; pre-engineered storage facility; pre-engineered storage facility; and pre-engineered storage facility.
The Project consists of the complete demolition and removal of the existing headhouse and shelter damaged by Hurricane Helene and construction of a new structure. The new Lanier County High School Headhouse & Shelter will include: Pre-Engineered Metal Building: The entire structure will be designed and constructed as a preengineered metal building to ensure durability, cost-effectiveness, and ease of installation. Foundations and Reinforcement: A new concrete pad, complete with footers, concrete ramps for doors, and proper reinforcement, will be installed to support the pre-engineered metal structure and ensure long-term structural stability. Electrical Service: Sufficient electrical service will be provided to power appropriate needs for the structure including lighting, receptacles, & HVAC. Size: The overall structure will measure 30' X 150' with a 2-12 pitch on the roof and 12' wall height. Enclosures: 110' of the structure will be enclosed starting from the west end. The enclosed portion will be divided into two sections (80' and 30' respectively, beginning from the west end), and 40' of the east end will be open shelter. Enclosures will include 3-12' wide roll up doors and 2-personnel doors. Exterior Roofing & Siding: The entire structure will be clad with durable, commercial-grade sheet metal siding to provide weather resistance, durability, and an aesthetically professional appearance. Insulation and HVAC: Full spray foam insulation will be provided for the entire structure including the ceiling and walls. Enclosures will be prepped for wall pack A/C units. Specifications on the HVAC units can be provided upon request. Drawings for submittal to Fire Marshall: Contractor will provide floor plan drawings for submittal to Fire Marshall Bid Bond security shall be submitted as required by Ga Law. Owner reserves the right to reject any and all bids and to waive informalities and irregularities Questions from Offerors regarding this Request for Proposals shall be submitted in writing via email to Brad Doyon at bradford.doyon@lanier.k12.ga.us. Phone calls will not receive a response. Offerors shall begin the Work upon receipt of the Notice to Proceed and shall complete the Work by a date agreed upon by the owner and contractor.
Post-Bid
Educational
Public - County
Demolition, New Construction, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 8, 2025
August 7, 2025
52 W Patten Ave, Lakeland, GA
Related To This Project
Lakeland, GA
--
Lakeland, GA
Bid Date: Jun 10 2025
Lakeland, GA
Bid Date: Sep 10 2025
Lakeland, GA
Bid Date: Sep 16 2025
Lakeland, GA
Bid Date: Sep 11 2025
Lakeland, GA
Bid Date: Sep 18 2025
Lakeland, GA
Bid Date: Nov 19 2025
Lakeland, GA
Bid Date: Jan 22 2026
Lakeland, GA
Bid Date: Jun 10 2025
Lakeland, GA
Bid Date: Mar 31 2025
Lakeland, GA
--
Lakeland, GA
Bid Date: Jan 29 2025
Lakeland, GA
Bid Date: Dec 02 2024
Lakeland, GA
Bid Date: Nov 19 2024
Lakeland, GA
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
