BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 26, 2025 at 8:00 PM

Updated September 27, 2025

Site work for a water / sewer project in Lakeland, Georgia. Completed plans call for site work for a water / sewer project.

The project involves the replacement of existing vitrified clay pipe (VCP) and PVC sanitary sewer mains within residential streets using trenchless pipe bursting methods. The existing sewer mains will be replaced with high-density polyethylene (HDPE) pipe. The scope of work includes the replacement of approximately 1,183 linear feet of 10-inch diameter VCP with 10-inch HDPE, 1,661 linear feet of 6-inch VCP with 8-inch HDPE, and 451 linear feet of 6-inch PVC with 8-inch HDPE. In addition to pipe replacement, the project includes the rehabilitation and replacement of existing manholes, construction of new manholes, sewer service transfers, and complete restoration of all disturbed areas. This project is funded through the Community Development Block Grant (CDBG) program. Time allotted for completion of work is 180 consecutive calendar days. All Work shall be completed in accordance with the plans and specifications. The Work will be awarded in one (1) Contract. Bids shall be accompanied by a bid bond or certified cashier's check in an amount not less than 10% of the base bid. Performance and Payment Bonds, each in an amount equal to 100% of the contract price shall be required of the successful bidder if contract is awarded. Owner reserves the right to reject any or all Bids, including without limitation, the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner. PN - 24P-X-086-2-6405 Question Deadline 09/03/2025 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: Will Jackson 24 1st Avenue NE, Moultrie, Georgia 31768 229-668-0663 wjackson@cartersloope.com. Questions received less than seven days prior to the date for opening of Bids may not be answered.

Bid Results

Water / Sewer

$712,817.00

Public - City

Site Work

13

9

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
38
Bidding Soon
622
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2025

October 10, 2025

Project location map

Multiple Locations, Lakeland, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.