BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 6, 2026 at 7:00 PM

Updated February 7, 2026

Site work for a playground / park / athletic field in Lakeland, Georgia. Completed plans call for site work for a playground / park / athletic field.

**As of February 6, 2026, this project has not yet been awarded. A timeline for award is within two weeks.** The Project is located in Lakeland, Georgia at the corner of South Oak Street and E Burnt Church Road. This project is the second phase of construction for the complex and includes all associated concrete work for the baseball/softball fields and multipurpose field that have already been constructed (field earthwork, irrigation, and grassing were completed in Phase 1) as shown on the plans prepared by LEA, PC. The contract time is 180 days. A 5% bid bond is required.

Bid Results

Playgrounds / Parks / Athletic Fields

$411,807.00

Public - County

Site Work

12

5

4

4

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
49
Bidding Soon
606
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 28, 2026

February 27, 2026

Project location map

Multiple Locations, Lakeland, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.