BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 24, 2025 at 7:00 PM

Updated November 25, 2025

Renovation of a water / sewer project in Sunrise, Florida. Conceptual plans call for the renovation of a water / sewer project.

The Springtree Wastewater Treatment Plant (WWTP) has a solids handling area with odor control system which was constructed in 1997 and is at the end of the useful life. The system is showing corrosion and the vessel is directly exposed to sunlight resulting in deterioration. Additionally, there are two process areas that need valve and actuator replacement within the same plant. The treated effluent at the plant is stored in the equalization tank. Motorized valves that control the flow going in and coming out are old and non-functional and need immediate replacement. The plant return activated sludge pump station valves and influent pump header are non-functioning. Replacement of these will require line stop and construction staging. The wastewater treatment plant has chlorine contact basins which have coatings that are currently worn out. Specialty coatings are needed to be specified by engineer along with sequencing for isolation and staging during construction. This project will benefit the environment by increasing the performance, improving the air quality at the WWTP and saving energy by lowering the amount of sludge pumping to lift station and wasterwater plant .This project is recommended in the 2019 Water and Wastewater Master Plan. The project is included in the City's 2026-2030 Capital Improvement Program (CIP). As of November 25, 2025, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$1,135,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
3
Bidding Soon
1,177
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2027

Project location map

4350 Springtree Dr, Sunrise, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.