BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Sunrise, Florida. Conceptual plans call for the renovation of a water / sewer project.

The Sawgrass WWTP is divided into two separate, parallel secondary treatment systems, Train A and Train B. Train A was originally constructed in two phases and completed in 1989, and Train B was added as part of a major expansion a decade later. Train B is scheduled for renewal and replacement. A BODR was developed in 2021 for the renewal and replacement project and consists of replacement of aeration tank influent gates, frames, manual handwheel operators, influent and effluent channel isolation stop gates, diffusers and appurtenances, butterfly valves and gaskets on the aeration system drop legs, orifice plate differential pressure air flow gauges and dissolved oxygen transmitter. This project is in the 2019 Water and Wastewater Master Plan. The project is include in the city's 2024-2028 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$5,376,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
50
Bidding Soon
1,114
All Active Projects
503
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2026

img_map_placeholder

14150 NW 8th St, Sunrise, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.