BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Monument, Colorado. Completed plans call for site work for a water / sewer project.

Dawson Well Central Water Treatment Plant Bids received after this time will not be accepted and will be returned unopened. The Work of this Contract consists of all necessary labor, supervision, equipment, tools, and materials for construction of the DA Well CWTP pump, motor, drop pipe, and all associated piping, electrical, and controls. Work to include all associated site work related to the project. Close coordination between onsite contractors is imperative. It shall be the sole responsibility of the Contractor to coordinate execution schedules, equipment, and working spaces to avoid any delays to the project. All project impacts and delays shall be the sole responsibility of the Contractor and shall under no circumstances incur additional costs to WWSD. Bids shall be on a lump sum basis per the bid form. A notice to proceed is anticipated by May 2024. The District designates the following person, as its representative and Point-of-Contact for this RFP. Respondents shall restrict all contact with the District and direct all questions in writing regarding this RFP to the below Point-of-Contact person: Kelsey Traxinger, P.E. JVA, Incorporated 1675 Larimer Street, Suite 550 Denver, CO 80202 303-951-1035 ktraxinger@jvajva.com Each Bidder shall file with his Bid a Bid security in the form of a cashier s check, certified check or a bidder s bond in accordance with the Instructions to Bidders. The bidder to whom the contract is awarded will be required to furnish a performance bond guaranteeing faithful performance and a labor and material payment bond guaranteeing payment of all debts arising out of the work. No bid may be withdrawn for 60 days after the date Bids are opened. WWSD reserves the right to reject any or all Bids, and to waive any informalities or irregularities therein.

Award

Water / Sewer

$192,610.00

Public - County

Site Work

14

14

2

6

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
49
Bidding Soon
860
All Active Projects
337
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2024

July 1, 2024

img_map_placeholder

To Be Determined, Monument, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.