BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Commerce City, Colorado. Completed plans call for site work for a water / sewer project.

The project generally consists of replacing existing 4-inch, 6-inch, and 8-inch water lines with new 8-inch water mains and replacing existing water service lines with new services and appurtenances, with service line sizes ranging from new 5/8-inch to 1-1/2-inch, for the South Adams County Water and Sanitation District in Commerce City, Colorado. The project area is located on several different streets in the same general area. The main project area is bound by E. 74th Place to the north, E. 74th Avenue to the south, Quebec Street to the east, and Oneida Street to the west. In addition to the main project area, this project will also include work to be completed on Newport Street bound by Highway 2 to the north and E. 74th Avenue to the south, Garden Lane loop off E. 74th Place, and Garden Court loop off E. 74th Avenue. The project is comprised of a Base Bid and one bid alternate. The Base Bid consists of installing approximately 5,200 linear feet of 8-inch water line and replacing and transferring a total of 113 water service lines, installing new fire hydrants, and associated asphalt removal and replacement. Alternate No. 1 work area is located on the Oneida Drive loop bound by E. 74th Avenue to the north and consists of installing approximately 690 linear feet of 8-inch water line and replacing and transferring a total of 11 water service lines, installing one new fire hydrant, and removing and replacing the existing street asphalt. It is the Owner s desire to award a Contract for the Base Bid. If easement acquisition and/or permissions from property owners on Oneida Drive allow, the Owner may choose to add Alternate No. 1 to the Contract. Bid security in the amount of 5 percent of the total Bid must accompany each Bid. The successful Bidder will be required to furnish a Construction Performance Bond and a Construction Payment Bond as security for the faithful performance and the payment of all bills and obligations arising from the performance of the contract. It is anticipated that the Contract Agreement will be signed and the Notice to Proceed will be issued in late May 2024.Construction shall be completed and ready for final payment within one hundred fifty (150) calendar days. The District reserves the right to reject any and all Bids, to waive informalities, and to reject non-conforming, non-responsive, or conditional Bids.

Award

Water / Sewer

$2,747,450.00

Public - County

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
38
Bidding Soon
983
All Active Projects
412
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2024

May 1, 2024

img_map_placeholder

Multiple Locations, Commerce City, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.