BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Westchester, Illinois. Completed plans call for site work for a water / sewer project.

The proposed work is officially known as "KENSINGTON AVENUE WATER MAIN IMPROVEMENTS PROJECT" and further described as new 8" PVC water main installation, construction of lateral WMQ storm sewers, abandoning the existing water main, water service box removal and replacement, valve vaults, fire hydrants, lead service replacement into the home, and all necessary restoration as further described in the contract documents for the said work prepared by Christopher B. Burke Engineering, Ltd. (CBBEL). Bond Notes: All bid proposals must be accompanied by a bid bond, certified check, or bank cashier's check payable to the Village of Westchester for ten (10) percent of the amount of the bid as provided in the General Provisions. No proposals or bids will be considered unless accompanied by such bond, or check. PERFORMANCE BOND The successful BIDDER for the construction of the improvements will be required to enter into Performance and Labor and Material Payment bonds equal to 100% of the amount of the bid with sureties to be approved by the Mayor and Village Board, when entering into the contract for the work, which shall be conditioned upon the proper and faithful performance by the CONTRACTOR of the work specified in accordance with the contract documents therefore, and the ordinances providing for the work. All work, including punchlist items, shall be completed within 30 Working Days. Owner Rights: The VILLAGE reserves the right to defer the award of the contract for a period not to exceed thirty (30) calendar days after the date bids are received, and to accept or reject any or all proposals and to waive technicalities.The Village of Westchester reserves the right to accept the proposal deemed to be in its own best interest based on all of the above considerations. Bids will be acted upon by the Village Board.

Award

Water / Sewer

$1,041,055.00

Public - City

Site Work

25

5

4

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
173
Active Projects
89
Bidding Soon
1,772
All Active Projects
764
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2024

June 17, 2024

img_map_placeholder

Kensington Ave, Westchester, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.