EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 13, 2024 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in West Valley City, Utah. Completed plans call for site work for a water / sewer project.

Drilling of a test hole and detailed water quality sampling with depth followed by drilling for a production well using the rotary drilling method. The well will be used in the Granger Hunter Improvement District drinking water system. Well #18 is anticipated to be completed with a 20-inch diameter casing to a total depth of approximately 1,000 feet. Figure 1 shows the location and site plan of the well, Figure 2 shows the anticipated well design, and Figure 3 shows the well head completion. Bond Notes: A five percent (5%) Bid Bond will be required. All questions related to the project shall be directed to the ENGINEER or the Q&A Board via (u3P) on or before April 24, 2024. HANSEN, ALLEN & LUCE, INC. 859 W. South Jordan Pkwy, Ste 200 South Jordan, Utah 84095 Attention: Scott Greenhalgh, P.G., Project Geologist Phone: 801-995-0324 Owner Rights: GRANGER-HUNTER IMPROVEMENT DISTRICT reserves the right to reject any or all bids submitted. Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner further reserves the right to reject the Bid of any Bidder whom it finds, after reasonable inquiry and evaluation, to be non-responsible. Owner also reserves the right to waive all informalities not involving price, time, or changes in the Work and to negotiate contract terms with the Successful Bidder. Liquidated Damages :1. Substantial Completion: CONTRACTOR shall pay OWNER $200.00 for each day that expires after the time (as duly adjusted pursuant to the Contract) specified above for Substantial Completion, until the Work is substantially complete. 2. Completion of Remaining Work: After Substantial Completion, if CONTRACTOR shall neglect, refuse, or fail to complete the remaining Work within the Contract Times (as duly adjusted pursuant to the Contract) for completion and readiness for final payment, CONTRACTOR shall pay OWNER $200.00 for each day that expires after such time until the Work is completed and ready for final payment. 3. Liquidated damages for failing to timely attain Milestones, Substantial Completion, and final completion are not additive, and will not be imposed concurrently.

Award

Water / Sewer

$1,367,530.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

14

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Dewatering
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
33
Bidding Soon
584
All Active Projects
262
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2024

July 1, 2024

img_map_placeholder

Multiple Locations, West Valley City, UT

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

GHID Well #18 Drilling Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.