Site work for a water / sewer project in West Valley City, Utah. Completed plans call for site work for a water / sewer project.

Drilling of a test hole and detailed water quality sampling with depth followed by drilling for a production well using the rotary drilling method. The well will be used in the Granger Hunter Improvement District drinking water system. Well #18 is anticipated to be completed with a 20-inch diameter casing to a total depth of approximately 1,000 feet. Figure 1 shows the location and site plan of the well, Figure 2 shows the anticipated well design, and Figure 3 shows the well head completion. Bond Notes: A five percent (5%) Bid Bond will be required. All questions related to the project shall be directed to the ENGINEER or the Q&A Board via (u3P) on or before April 24, 2024. HANSEN, ALLEN & LUCE, INC. 859 W. South Jordan Pkwy, Ste 200 South Jordan, Utah 84095 Attention: Scott Greenhalgh, P.G., Project Geologist Phone: 801-995-0324 Owner Rights: GRANGER-HUNTER IMPROVEMENT DISTRICT reserves the right to reject any or all bids submitted. Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner further reserves the right to reject the Bid of any Bidder whom it finds, after reasonable inquiry and evaluation, to be non-responsible. Owner also reserves the right to waive all informalities not involving price, time, or changes in the Work and to negotiate contract terms with the Successful Bidder. Liquidated Damages :1. Substantial Completion: CONTRACTOR shall pay OWNER $200.00 for each day that expires after the time (as duly adjusted pursuant to the Contract) specified above for Substantial Completion, until the Work is substantially complete. 2. Completion of Remaining Work: After Substantial Completion, if CONTRACTOR shall neglect, refuse, or fail to complete the remaining Work within the Contract Times (as duly adjusted pursuant to the Contract) for completion and readiness for final payment, CONTRACTOR shall pay OWNER $200.00 for each day that expires after such time until the Work is completed and ready for final payment. 3. Liquidated damages for failing to timely attain Milestones, Substantial Completion, and final completion are not additive, and will not be imposed concurrently.

Award

Water / Sewer

$1,367,530.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

14

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
72
Bidding Soon
997
All Active Projects
402
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 1, 2024

July 1, 2024

December 28, 2024

img_map_placeholder

Multiple Locations, West Valley City, UT

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.