Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a water / sewer project in Hot Sulphur Springs, Colorado. Completed plans call for the renovation of a water / sewer project.
Reference Number 0000347631 Job Location: 200 Maple Street Hot Sulphur Springs, Colorado United States 80451 The Project includes upgrading the town's pre-filtration strainer by installing an automatic backwashing 250-micron strainer by Bollfilter prior to membrane filtration. The Bollfilter Unit has already been purchased by the Town and will be onsite at construction. The existing 500-micron manual clean strainer will remain in place to serve as a backup to the Bollfilter, as well as provide system redundancy. The 250-micron Bollfilter will be automatically cleaned based on integral instrumentation and automated controls. The existing process piping of the WTP will need to be reconfigured which will the WTP membrane filtration process to temporarily cease. The process piping will be installed, tested, and disinfected appropriately prior to resuming treatment operations. The town will ensure the existing clear well, and two finished water storage tanks are full prior to this component of construction. The town's service area will also be notified of the implementation schedule and requested to reduce water consumption during this critical time to avoid shortages. The specifications, plans, design details, drawings and Bollfilter Instructions are to be considered part of the Contract and the Contractor shall follow the specifications with due perseverance. The work contemplated by the specifications consists of the provisions of labor, material, equipment (with exception to the Bollfilter Unit) and services required for all work as described herein. Unless otherwise specified, the plans and specifications are intended to include everything obviously prerequisite and necessary for the proper installation and completion of the work whether each necessary item is mentioned herein or not. The contractor being awarded the project shall act as the General Contractor and coordinate and contract with all required subcontractors such as for, but not limited to, electrical and/or controls etc. Contractor will coordinate with Plant Operator daily prior to any work being performed that day. Question Deadline 04/25/2024 at 3:00 PM MT Questions are submitted online Yes Buyer Preferences, Guidelines & Requirements General Requirements - Contractors License Required - FOB Destination - Installation Required - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 %
Bid Results
Water / Sewer
$118,604.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 8, 2024
June 10, 2024
200 Maple St, Hot Sulphur Springs, CO
Related To This Project
Hot Sulphur Springs, CO
Bid Date: Aug 16 2024
Hot Sulphur Springs, CO
Bid Date: Sep 12 2024
Hot Sulphur Springs, CO
--
Hot Sulphur Springs, CO
Bid Date: Nov 04 2024
Hot Sulphur Springs, CO
Bid Date: Mar 27 2024
Hot Sulphur Springs, CO
--
Hot Sulphur Springs, CO
Bid Date: Mar 07 2024
Hot Sulphur Springs, CO
Bid Date: Oct 18 2023
Hot Sulphur Springs, CO
--
Hot Sulphur Springs, CO
--
Hot Sulphur Springs, CO
--
Hot Sulphur Springs, CO
Bid Date: Jul 07 2022
Hot Sulphur Springs, CO
Bid Date: Mar 05 2020
Hot Sulphur Springs, CO
Bid Date: Feb 25 2022
Hot Sulphur Springs, CO
Bid Date: Nov 30 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.