BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 12, 2025 at 7:00 PM

Updated November 13, 2025

Site work and paving for a road / highway in Wayzata, Minnesota. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

Reconstruct Gleason Lake Road (CSAH 15) from 1,150' South of Gleahaven Road to Vicksburg Lane in the Cities of Minnetonka, Plymouth, and Wayzata. Purpose & Description: The existing roadway (last reconstructed in 1965) is nearing the end of its useful life and warrants replacement. Routine activities (such as overlays and crackseals) are no longer cost effective in preserving assets. The current roadway environment consists of an antiquated design that includes bituminous curb that offers poor drainage, wooden retaining walls located immediately adjacent to the roadway surface, and a 2-lane undivided configuration with minimal shoulder space available on both sides. In addition, the corridor lacks turn lanes for people driving desiring to access the predominantly residential area. For people walking and biking, a multi-use trail facility exists on the north side of Gleason Lake Road (CSAH 15) for a portion of the corridor; however, it's current design and condition suggest that a full replacement is necessary to ensure a safe and adequate level of service for multimodal users. Many intersections do not satisfy current ADA design requirements, presenting challenges for people with limited mobility. The proposed project will include new assets, including pavement, curb, storm water structures, and multimodal facilities. It is anticipated that a 2- lane configuration will be retained; however, specific pedestrian crossing enhancements, bikeway accommodations, and streetscaping features will be considered to promote accessibility, mobility, and safety for multimodal users. In addition, the existing retaining walls will be evaluated as part of the project development process to determine the preferred method for accommodating the surrounding topography. Construction Q2 2028 - Q4 2028 Completion 2029 The project is included in the County 2026-2030 Capital Improvement Program (CIP). As of November 12, 2025, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$5,411,000.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
236
Active Projects
131
Bidding Soon
1,409
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2028

Project location map

Gleason Lake Rd, Wayzata, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.