Published April 11, 2025 at 8:00 PM
Updated April 12, 2025
Site work, outdoor lighting and renovation of a mixed-use development in Jupiter, Florida. Conceptual plans call for the renovation of a stadium; for site work for a playground / park / athletic field; and for outdoor lighting for a playground / park / athletic field.
Update: This project provides engineering and construction for facility renovations/equipment replacement for the restroom building and sports lighting at the Marlins Quad fields at Roger Dean Stadium. The planned renovations consist of building reroof, ADA renovations to the restrooms, replacement of the countertops in the concession stand, installation of a concession window, other various building renovations, and installation of LED sports lighting to replace the existing system. The work would also install a control link on the sports lighting system to replace the current manual switches. Justification: The lighting and facility have reached a 20-year service life. As the facility has aged, the Town has identified equipment replacement and other rehabilitative work to maintain the facility in a first class condition. Project is included Town of Jupiter Fiscal Year 2025-2029 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- https://www.sportsbusinessjournal.com/Articles/2025/03/21/cardinals-to-begin-108m-revised-renovation-of-spring-training-facility/ Within 24 hours of the St. Louis Cardinals leaving their longtime spring training home on Monday morning, “some construction will begin for an overhaul more than 12 years in the pursuing and two years in delays to modernize the facility for the next several decades,” according to Derrick Goold of the ST. LOUIS POST-DISPATCH. The planned $108M renovation of the Cardinals’ and Marlins’ Roger Dean Stadium complex that was originally “supposed to be completed by the start of this spring will begin, finally, when this spring ends and both teams leave for the regular season.” The delay led to a “significant increase in cost and already forced the teams to revise the initial concepts in the most substantive change to the complex since it opened in 1998.” Instead of demolishing existing buildings, they will now “be reconfigured and expanded.” It will also be “completed in a shorter window than the previous plan.” The Cardinals “expect this reimagined renovation to be” 70% to 80% completed before February 2026 and the start of spring training. ----------------------------------- This project provides engineering and construction for facility renovations/equipment replacement for the restroom building and sports lighting at the Marlins Quad fields at Roger Dean Stadium. The planned renovations consist of building reroof, ADA renovations to the restrooms, replacement of the countertops in the concession stand, installation of a concession window, other various building renovations, and installation of LED sports lighting to replace the existing system. The work would also install a control link on the sports lighting system to replace the current manual switches. The project is include in the City's 2024 - 2028 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Arenas / Stadiums
$1,720,000.00
Public - City
Outdoor Lighting, Renovation, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2027
Multiple Locations, Jupiter, FL
Related To This Project
Jupiter, FL
--
Jupiter, FL
Bid Date: Apr 21 2025
Jupiter, FL
Bid Date: Sep 21 2021
Jupiter, FL
Bid Date: May 21 2025
Jupiter, FL
--
Jupiter, FL
--
Jupiter, FL
Bid Date: Jul 31 2025
Jupiter, FL
Bid Date: Apr 23 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.