Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 11, 2025 at 8:00 PM
Updated April 12, 2025
Site work and paving for a road / highway in Jupiter, Florida. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
Update: Establish a precise alignment for the southern extension of the Western Corridor south of Indiantown Road with connection to Jupiter Park Drive. From the precise alignment, prepare preliminary engineering plans and establish right of way; acquire right of way. Justification: This connection will be a thoroughfare to access the Hawkeye Property and the Jupiter Park of Commerce. The connection will provide a reduction in trips at Central Boulevard and Indiantown Road. Project is included Town of Jupiter Fiscal Year 2025-2029 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Update: https://www.jupiter.fl.us/DocumentCenter/View/33451/FY2024-Adopted-CIP-Budget Establish a precise alignment for the southern extension of the Western Corridor south of Indiantown Road with connection to Jupiter Park Drive. From the precise alignment, prepare preliminary engineering plans and establish right of way. Compose the design utilizing consultant staff and update the overall estimate. Await land transfers from developers in order to obtain the necessary right of way Project is included Town of Jupiter Fiscal Year 2024-2028 Page no 17 ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Southern Extension of Island Way Project is included Town of Jupiter FY 2020-2024 CIP. As of October 15, 2020, information regarding a design team or a general contractor is not available. A firm timeline for construction has not been determined. The projected In Service date for this project is 2022.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Roads / Highways
$700,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2026
Island Way, Jupiter, FL
Related To This Project
Jupiter, FL
--
Jupiter, FL
--
Jupiter, FL
Bid Date: Apr 21 2025
Jupiter, FL
--
Jupiter, FL
Bid Date: Jul 31 2025
Jupiter, FL
Bid Date: Apr 23 2025
Jupiter, FL
Bid Date: Apr 17 2025
Jupiter, FL
Bid Date: Apr 01 2025
Jupiter, FL
Bid Date: Mar 25 2025
Jupiter, FL
Bid Date: Mar 11 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
