BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 11, 2025 at 8:00 PM

Updated April 12, 2025

Site work and paving for a road / highway in Jupiter, Florida. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

Update: The asphalt roadways at the water treatment plant are deteriorating and in need of repair. These roads are regularly traveled by chemical tanker trucks and tractor trailers with deliveries making continued water production possible. Critical infrastructure exists beneath much of the asphalt. This project proposes to mill approximately 12,500 SY of existing asphalt to a depth of 1", overlay with new asphalt, and provide new striping. This project supports the Town's Strategic Plan Result of Fiscal Responsibility by maintaining utility facilities to help achieve and maximize useful life of assets. Failure to maintain the asphalt in good condition will result in continued deterioration jeopardizing integrity of critical infrastructure buried beneath the roadways. This project is scheduled for 2028, to occur after completion of other major construction activities planned at the water plant. The project budget has been increased by $25,072 in accordance with current construction market pricing. Project is included Town of Jupiter Fiscal Year 2025-2029 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- The asphalt roadways at the water treatment plant are deteriorating and in need of repair. These roads are regularly traveled by chemical tanker trucks and tractor trailers with deliveries making continued water production possible. Critical infrastructure exists beneath much of the asphalt. This project proposes to mill approximately 12,500 SY of existing asphalt to a depth of 1", overlay with new asphalt, and provide new striping.. The project is include in the City's 2024 - 2028 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$388,800.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
1
Bidding Soon
816
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.