Published October 2, 2025 at 8:00 PM

Updated October 3, 2025

Renovation of a fire / police facility in Provincetown, Massachusetts. Completed plans call for the renovation of a 1,310-square-foot, two-story above grade fire / police facility.

Fire House 2 Renovation of upper floors. The renovation of Firehouse Station #2 in Provincetown is an exciting project focused on preserving the historic structure while adapting the upper floors into housing for up to 5 individuals in private bedrooms. Question Deadline 09/13/2024 at 4:16 PM ET Construction must be substantially complete by March 1, 2025. No Bidder may withdraw his/her Bid for a period of thirty (30) calendar days after the actual date of the opening of the Bids. The Work under this Contract includes, but is not necessarily limited to the: Interior reconfiguration to create affordable housing at historic Fire House #2, located at 189 Commercial St. Provincetown, MA 02357. Reconfigure Second Floor to create: (2) bedrooms, (1) bathroom, (1) kitchen/lounge. Reconfigure Third Floor to create: (3) bedrooms, (1) half bath, (1) shower room, and (1) mechanical room. First Floor is to remain as-is. Removal of the existing roof system; Addition of (2) dormers as shown in contract documents; Replacement of roof system. Installation of mini-splits. This bid does not include the construction of an exterior egress stair The successful Bidder must furnish 100 percent (100%) Construction Performance Bond and 100 percent (100%) Construction Payment Bond cashier's check, bid bond or cash in the amount of 5 (five) percent of the value of the Bid The Owner reserves the right to waive any informality in or to reject any or all Bids if deemed to be the best interest of the Town of Provincetown. A. A general description of the work to be performed under this contract shall include, but will not be limited to, the following construction operations: 1. Coordination of all construction activities with the appropriate local and State Authorities, and utilities. 2. Attending the Pre-construction conference and the required job progress meetings. 3. Submission of all required shop drawings, in a timely manner, to the Engineer, for review. 4. Perform all field engineering and surveying associated with the project work including, but not limited to: construction layout and elevations and preparation of an as-built plan at the completion of the project. 5. Mobilization to the Site and Demobilization from the Site. 6. Providing Site Security and other construction site control measures, as needed. Protection of existing on-site structures. 7. Construction work including removing and replacing existing carpet, tile, sound board, sheetrock, insulation, cabinets, plywood cement, doors and trim, carpet step, and baseboards and trim. 8. Obtaining necessary permits and licenses, maintaining all items required by applicable permits, and payment of fees from the Town of Provincetown The Work consists of the renovation of Fire House 2 and all work incidental thereto, in accordance with the Specifications and conceptual plans attached hereto. Additional drawings showing details in accordance with which the Work is to be done may be furnished by addendum from time to time during the bidding period by the Owner or its Architect/Engineer, and shall then become a part of the Contract Documents. The Contractor shall furnish all labor, services, materials, equipment, plant, machinery, apparatus, appliances, tools, supplies, and all other things necessary to do all work required for the completion of each item of the Work and as herein specified. The Work to be done and paid for under any item shall not be limited to the exact extent mentioned or described but shall include all incidental work necessary or customarily done for the completion of that item. Interior reconfiguration of the 2nd & 3rd floor of Fire House #2 to create (1) AHU:(2) bedrooms, (2) bathrooms, (1) kitchen, and (2) living room areas; Addition of 2 dormers. Mini split installation. Question Deadline 08/04/2025 at 12:00 AM ET online question deadline

Award

Fire / Police

$200,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

21

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
436
Active Projects
234
Bidding Soon
3,141
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 22, 2025

September 22, 2025

Project location map

189 Commercial St, Provincetown, MA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.