Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a municipal facility in Oregon City, Oregon. Completed plans call for the renovation of a municipal facility.
All work will be directed by representatives from the Clackamas Chapter of Trout Unlimited, US Forest Service Enterprise Program and Clackamas River Ranger District, and ODFW biologists. The goals of the Cub Creek Phase II Restoration project are to increase habitat connectivity, availability, complexity, and quality for anadromous ESA-listed salmonids and resident aquatic species through the redistribution of alluvium and addition of large wood. Cub Creek Phase II work being implemented in 2024 is designed to restore lower Cub Creek (River Mile (RM) 0.0 to 0.4) to a Stage 0 condition and increase the density of large wood across the valley floor. Phase II work will include the following activities: 1. Establishing access routes by navigating equipment through a fire-killed stand, clearing logs and trees from access routes and staging them for placement across the floodplain. 2. Placing barrier nets for fish salvage efforts. 3. Redistributing sediment from removal (cut) zones to stockpiled areas along the edge of the current main channel allowing for shaping of the floodplain to match the geomorphic grade line relative elevation model (GGLREM), 4. Installment of a temporary drivable berm separating the floodplain from the main channel for water diversion. 5. Filling of super sacks with alluvium and securing them to the top of the main channel thereby isolating and dewatering the main channel, redistributing sediment from the berm to the main channel to match the GGLREM. 6. Placement and partial burial of large wood and slash across the valley floor, and rehabilitation of the entire Project Area. Bids for construction of the Cub Creek Phase II Restoration Project are welcome from all qualified parties. Questions regarding the project will be accepted until May 27, 2024.
Award
Municipal
$531,265.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 31, 2024
July 15, 2024
To Be Determined, Oregon City, OR
Related To This Project
Oregon City, OR
--
Oregon City, OR
Bid Date: Nov 20 2020
Oregon City, OR
Bid Date: May 30 2024
Oregon City, OR
--
Oregon City, OR
Bid Date: Dec 23 2020
Oregon City, OR
Bid Date: Nov 17 2021
Oregon City, OR
Bid Date: May 25 2021
Oregon City, OR
--
Oregon City, OR
Bid Date: May 01 2024
Oregon City, OR
Bid Date: May 02 2024
Oregon City, OR
--
Oregon City, OR
Bid Date: Nov 13 2024
Oregon City, OR
Bid Date: Jun 27 2024
Oregon City, OR
Bid Date: Apr 10 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.