BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 3, 2025 at 8:00 PM

Updated June 4, 2025

Renovation of a mixed-use development in Harvard, Massachusetts. Conceptual plans call for the renovation of a municipal facility; parking garage; and pre-engineered storage facility.

As of June 3, 2025, this project is in the conceptual phase and has been put on hold. It will likely will not resume officially until FY27. Architect award information has not been determined. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: DPW Facility Renovation: Three new buildings (Connector/Admin; Mechanic's Bay, Pole Barn) at the same/proximate location as existing structures. The work will include, but is not limited to, assisting the Town, working with the architect/engineer and the Town on the design, bidding, and construction administration phases of the project. Estimated Construction Cost $10,000,000.

Conceptual

Parking Garage

$10,029,000.00

Public - City

Renovation

12

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
685
Active Projects
388
Bidding Soon
4,693
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2027

Project location map

To Be Determined, Harvard, MA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.