BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a fire / police facility in Sanger, California. Completed plans call for the renovation of a fire / police facility.

Description Contractor shall provide all materials, labor, equipment, tools, permits, taxes, transportation, and fees to remove, legally dispose, and replace existing generator with a new 100-kilowatt (kw) generator. This contract requires Prevailing Wages if the total bid amount exceeds $1,000.00 , the successful bidder shall furnish a Payment Bond for not less than 100 percent (100%) of the total amount payable by the terms of this Agreement. Written Question Submittal April 25, 2024 The Prime Bidder must possess a C-10 Electrical license issued by the California Contractors State Licensing Board (CSLB) and provide proof of such as required in Required Attachment Checklist, Technical questions regarding this solicitation will be addressed, in writing, and in accordance with the Questions and Answers portion of this IFB. See Section C, Item 1, Key Action Dates for more details. Kelly McGrew Contract Analyst 1. Contractor agrees to provide to the California Department of Forestry and Fire Protection (CAL FIRE) Generator Replacement Services. 2. Contractor shall provide all materials, labor, equipment, tools, permits, taxes, transportation, and fees to remove, legally dispose, and replace existing generator with a new 100-kilowatt (kw) generator. Written Question Submittal April 25, 2024 Potential Bidders may submit written questions regarding the bid by April 25, 2024. All questions should be emailed in writing to kelly.mcgrew@fire.ca.gov. NO QUESTIONS will be accepted after April 25, 2024. B. Written questions must include: the individual's name, firm name, complete address and must reference IFB No. 4CA06718. Contractor agrees to provide to the California Department of Forestry and Fire Protection (CAL FIRE) Generator Replacement Services, as described herein: Contractor shall provide all materials, labor, equipment, tools, permits, taxes, transportation, and fees to remove, legally dispose, and replace existing generator with a new 100-kilowatt (kw) generator. 2. CAL FIRE has the right to extend this agreement for one (1) year by amendment at the same terms, conditions, and costs. 3. Subcontracting is not permitted under this Agreement. All references to subcontracting or Subcontractors as found herein are not applicable to this Agreement. 4. The services shall be performed at CAL FIRE Fresno Kings Unit Head Quarters, 210 South Academy, Avenue Sanger, CA 93657

Award

Fire / Police

$99,645.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
45
Bidding Soon
579
All Active Projects
258
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 9, 2024

June 1, 2024

June 30, 2025

img_map_placeholder

210 S Academy Ave, Sanger, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.