BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a civil project in Yuma Proving Ground, Arizona. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Description of the Standard Specifications is modified to add: Remove the existing single span bridge, pavement on the bridge, pavement on the bridge, abutments, and guardrail on Avenue 3E over the "A" Canal. The Contractor shall perform all work as may be necessary to complete the contract in a satisfactory and acceptable manner in full compliance with the plans, specifications and terms of the contract. Complete closure of Avenue 3E will be a limited time from Saturday 11/23/2024 to Saturday 12/14/2024 using a detour. The detour for the project will start at the intersection of Avenue 3E and County 14th Street. It will travel east on County 14th Street for one mile to Avenue 4E, then south on Avenue 4E for one mile to County 15th Street, then west on County 15th Street for one mile to end at Avenue 3E for a total of 3 miles. The work shall be done under the direction of an Arizona registered professional engineer employed by the contractor. All right of way monuments and lines shall be established by an Arizona registered land surveyor employed by the contractor. Project plans are based on topographic survey and base mapping prepared by James Davey and Associates. The items listed in the Bid Schedule of the Proposal are intended to include the major items for the project; however, there is other work necessary to complete the project. If work to complete the project has not been designated by a specific item on the Bid Schedule, the Contractor shall include the cost for the work in some related bid item so that his Proposal for the project does reflect the total cost of all necessary and required work to complete the project in its entirety. The construction of this project is to be completed by the dates listed below and the canal dryup/water outage period as established by the Yuma Mesa Irrigation and Drainage District (District) and Yuma County. No extensions of the times specified will be granted. Irrigation deliveries through the canal will commence immediately at the end of the water outage period. The anticipated project milestones are as follows: Advertise for Bid April 19 and 26, 2024 Bid Opening Monday, May 13, 2024 Award Bid Monday, June 3, 2024 Notice to Proceed No later than July 11, 2024 Order Precast Concrete Box Culvert Deliver Precast Concrete Box Culvert near the Project Site November 17, 2024 Close Avenue 3E to traffic Saturday, November 23, 2024 Remove existing Bridge and 200 feet of Avenue 3E "A" Canal Water Shutoff Saturday, November 30, 2024 at 12:00 a.m. Remove concrete canal lining & prepare box culvert foundation Install Double Cell Precast Concrete Box Culvert Install Inlet & Outlet Headwall structures, Backfill box Culvert, Install Concrete Lining Transitions, Install Irrigation Turnout Complete Concrete Lining Tie-Ins End Canal Dry-up/Water Outage & water turn on Construct Avenue 3E over the new box culvert Open Avenue 3E to traffic Complete all remaining items and final cleanup December 8, 2024 12 p.m. noon Monday, December 9, 2024 at 12:00 a.m. Saturday, December 14, 2024 Sunday, December 15, 2024 Friday, December 20, 2024 Project Complete Rights-of-way provided for use by the contractor consist solely of the U.S. Bureau of Reclamation A Canal right-of-way and the Yuma County Avenue 3E road right-of-way as shown on the plans. The Contractor shall be responsible and shall make his own arrangements for the use of any adjacent private property if necessary. The proposed work is located at Avenue 3E over the A Canal at County 14 ½ Street. The work consists of, but is not limited to: Removal of an existing steel bridge, installation of a double cell precast concrete box culvert, paving and miscellaneous work. The Yuma County Board of Supervisors reserves the right to reject any or all bids and to waive any informalities or irregularities in a bid, as it may deem in the best interest of the County.)" Each bid must be submitted in accordance with the Project's Proposal Pamphlet and on the forms provided therein including, the non-collusion affidavit and a certified or cashier's check or bid bond in the amount of ten percent of the total amount of the bid.) " The amount programmed for the base bid is $1,000,000. The project construction will start on Saturday 11/23/2024 and all work shall be complete and in place by Friday 12/20/2024.)

Post-Bid

Bridges / Tunnels

$1,000,000.00

Public - County

Demolition, New Construction, Paving, Site Work

15

8

8

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
9
Bidding Soon
118
All Active Projects
49
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Winning Bids!

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 13, 2024

November 23, 2024

img_map_placeholder

Ave 3e, Yuma Proving Ground, AZ

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.