BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Southfield, Michigan. Completed plans call for the renovation of a municipal facility.

Reference Number 0000351264 There are a total of 21 locations throughout the City of Southfield that require furnishing (bench & trash receptacle) installations and/or concrete installation. The majority of these installations will be located at existing bus stops. All furnishings are stored at the DPW yard (25501 Clara Lane, Southfield, MI 48034) and will need to be picked up and transported to each installation site. Please note which project location(s) will require a permit from the Road Commission for Oakland County (RCOC) and include permit fees in your bid. Questions are submitted online No General Requirements - Installation Required - Insurance Required. Bonding Requirements - Bid Bond 5 %. Terry Croad, AICP, ASLA - Director of Planning Phone: 248-796-4154 Email: tcroad@cityofsouthfield.com. Souzan Hanna, ENV SP, LEED AP - Sustainability Planner Phone: 248-796-4156 Email: shanna@cityofsouthfield.com . Alex Bollin - Planner I Phone: 248-796-4153 Email: mbollin@cityofsouthfield.com. Black Bench & Trash Installation with Concrete Work 1. Bus Stop 175 Location: North side of W. 11 Mile Road & west of Stanford Drive Installation Instructions: 5'x13' concrete pad to be installed where markings are in the field. Install bench and trash facing east. 2. Bus Stop 176 Location: South side of W. 11 Mile Road & east of Standford Drive Installation Instructions: 5'x15' concrete pad to be installed where markings are in the field. Install bench and trash facing west on the existing keywalk. The new concrete pad will be used as the new walkway. 3. Bus Stop 178 Location: North side of W. 11 Mile Road (27100 W. Eleven Mile Road) Installation Instructions: 5'x13' concrete pad to be installed where markings are in the field. Install bench and trash facing east. 4. Bus Stop 190 Location: West side of Franklin Road, South of Centre Road (Village Club Apartments, 27525 Franklin) Installation Instructions: Install approximately 23'x5' concrete keywalk from the existing sidewalk to back of curb. 5'x13' concrete pad to be installed where markings are in the field. Install bench and trash facing northwest towards the instersection of Franklin Road and Centre Road. 5. Bus Stop 192 Location: West side of Franklin Road, North of 11 Mile Road (Village Club Apartments, 27525 Franklin) Installation Instructions: Install approximately 19'x5' concrete keywalk from the existing sidewalk to back of curb. 5'x13' concrete pad to be installed where markings are in the field. Install bench and trash facing northwest towards the Village Club Apartments drive approach. 6. Bus Stop 194 Location: East side of Franklin Road, South of 11 Mile Road (Lakeland Health & Rehabilitation Center, 26900 Franklin Road) Installation Instructions: Install approximately 26'x5' concrete keywalk from the existing sidewalk to back of curb. 5'x13' concrete pad to be installed where markings are in the field. Install bench and trash facing southeast. 7. Bus Stop 227 Location: West side of Evergreen Road, South of N. Norwood Drive Installation Instructions: 5'x13' concrete pad to be installed where markings are in the field. Install bench and trash facing north towards N. Norwood Drive. 8. Bus Stop 228 Location: East side of Evergreen Road, South of S. Norwood Drive (Evergreen Place Apartments, 24000 Evergreen Road) Installation Instructions: 5'x13' concrete pad to be installed where markings are in the field. Install bench and trash facing south. 9. Bus Stop 239 Location: Southeast corner of W. 9 Mile Road & Northwestern (17515 W. 9 Mile Road) Installation Instructions: 5'x13' concrete pad to be installed where markings are in the field. Install bench and trash facing north towards W. 9 Mile Road. 10. Bus Stop 355 Location: NW Corner of W. 9 Mile Road & Antique Lane (21000 W. 9 Mile Road) Installation Instructions: : 5'x13' concrete pad to be installed where markings are in the field. Install bench and trash facing south towards W. 9 Mile Road. 11. Bus Stop 356 Location: North side of W. 9 Mile & East of Lahser (21840 W. 9 Mile Road) Installation Instructions: 5'x10' concrete pad and 3'x3' concrete pad to be installed where flags/markings are in the field. Install bench facing east and install trash on the opposite side. CAUTION: Watch for irrigation heads in this area. 12. Bus Stop 358 Location: NW Corner of W. 9 Mile & Berg Road (23500 W. 9 Mile Road) Installation Instructions: 5'x13' concrete pad to be installed where flags/markings are in the field. Install bench and trash facing south. 13. Bus Stop 359 Location: North side of W. 9 Mile & East of Telegraph (23926 W. 9 Mile Road) Installation Instructions: 5'x13' concrete pad to be installed where flags/markings are in the field. A keywalk from the existing pathway to the back of curb to be installed with approximately 80 sft of concrete. Install bench and trash facing east. 14. Bus Stop West of Plum Hollow Golf Course Location: Southeast corner of W. 9 Mile Road & Berg Road (23325 W. 9 Mile Road) Installation Instructions: Install approximately 83'x 5' sidewalk extension and approximately 33'x5' keywalk to the existing bus stop. 5'x13' concrete pad to be installed where markings are in the field. Install bench and trash facing west towards the intersection of W. 9 Mile Road and Berg Road.

Post-Bid

Municipal

$250,000.00

Public - City

Renovation

8

3

5

4

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
162
Active Projects
105
Bidding Soon
1,487
All Active Projects
614
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2024

June 14, 2024

img_map_placeholder

Multiple Locations, Southfield, MI


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.