Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a transportation facility in Alamosa, Colorado. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.
Schedule - Acquire Self Contained Broom, Power Broom with a 4x4 Chassis Manufacturing for this project is expected to take 300 calendar day(s). Est. Completion Date: June 30, 2024 Site Directions: San Luis Valley Regional Airport-Bergman Field All questions regarding the bid are to be directed to Jon Weeks, PE with Woolpert, Inc., 720 South Colorado Blvd., Suite 1200-S, Glendale, Colorado, 80246, (303) 524-3030, Fax: (303) 524-3031, or email Jon.Weeks@ woolpert.com. Bid Bond. Guarantee will be required with each bid as a certified check on a solvent bank or a Bid Bond in the amount of five (5) % of the total amount of the bid, made payable to the Alamosa County. Supply Bond. The successful bidder will be required to furnish a supply bond each in an amount equal to 100% of the contract price. 1. The Offeror's or Bidder's attention is called to the "Equal Opportunity Clause" and the "Standard Federal Equal Employment Opportunity Construction Contract Specifications" set forth herein. 2. The goals and timetables for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows: Timetables Goals for minority participation for each trade: 19.0% Goals for female participation in each trade: 6.9% In order to submit a responsive bid as a Prime Contractor and to receive all necessary addendum(s) for this project, you must be on the Planholder's List. It is the planholder's responsibility to review the site for addendums and changes before submitting their proposal. This includes review for environmental changes. Environmental changes during construction could take up to three months for approval. For additional information, please contact us via email at bid.info@woolpert.com. Bid Conditions. The bidder is required to provide all information as required within the Contract Documents. The bidder is required to bid on all items of every schedule or as otherwise detailed in the Instructions to Bidders. Bids may be held by Alamosa County for a period not to exceed 120 calendar days from the date of the bid opening for the purpose of evaluating bids prior to award of contract. The right is reserved, as Alamosa County may require, to reject any and all bids and to waive any informality in the bids received. Airport and Airway Improvement Act of 1982 as Amended. In accordance with the Davis-Bacon Act, as amended, the Contractor will be required to comply with the wage and labor requirements and to pay minimum wages in accordance with the schedule of wage rates established by the United States Department of Labor. Equal Employment Opportunity and Affirmative Action Requirement. The proposed contract is under and subject to 41 CFR Part 60-4 and Executive Order 11246 of September 24, 1965, as amended, and to the equal opportunity clause and the Standard Federal Equal Employment Opportunity Construction Contract specifications including the goals and timetables for minority and female participation. Title VI Solicitation Notice: The (Name of Sponsor), in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 USC 2000d to 2000d-4) and the Regulations, hereby notifies all bidders or offerors that it will affirmatively ensure that for any contract entered into pursuant to this advertisement, select disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin (including limited English proficiency), creed, sex (including sexual orientation and gender identity), age, or disability in consideration for an award. Proposers are advised that the agreement resulting from this solicitation will include provisions mandated by the Federal Aviation Administration prohibiting discrimination by the contractor and its subcontractors. (The Owner) reserves the right to audit and inspect subcontracts to ensure compliance with this requirement. These goals are applicable to all of the Contractor's construction work (whether or not it is Federal or federally assisted) performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, it shall apply the goals established for such geographical area where the work is actually performed. With regard to this second area, the Contractor also is subject to the goals for both its federally involved and non-federally involved construction. The Contractor's compliance with the Executive Order and the regulations in 41 CFR Part 60-4 shall be based on its implementation of the Equal Opportunity Clause, specific affirmative action obligations required by the specifications set forth in 41 CFR 60-4.3(a) and its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade, and the Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor or from project to project for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, the Executive Order and the regulations in 41 CFR Part 60-4. Compliance with the goals will be measured against the total work hours performed. 3. The Contractor shall provide written notification to the Director of the Office of Federal Contract Compliance Programs (OFCCP) within 10 working days of award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the name, address, and telephone number of the subcontractor; employer identification number of the subcontractor; estimated dollar amount of the subcontract; estimated starting and completion dates of the subcontract; and the geographical area in which the subcontract is to be performed. 4. As used in this notice and in the contract resulting from this solicitation, the "covered area" is Colorado, Alamosa County, Alamosa. Federal Fair Labor Standards Act (Federal Minimum Wage) All contracts and subcontracts that result from this solicitation incorporate by reference the provisions of 29 CFR part 201, et seq, the Federal Fair Labor Standards Act (FLSA), with the same force and effect as if given in full text. The FLSA sets minimum wage, overtime pay, recordkeeping, and child labor standards for full and part-time workers. The Contractor has full responsibility to monitor compliance to the referenced statute or regulation. The Contractor must address any claims or disputes that arise from this requirement directly with the U.S. Department of Labor - Wage and Hour Division.
Post-Bid
Transportation Terminals
$200,000.00
Public - County
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 12, 2024
July 18, 2024
2490 State Ave, Alamosa, CO
Related To This Project
Alamosa, CO
Bid Date: Jun 27 2024
Alamosa, CO
--
Alamosa, CO
--
Alamosa, CO
Bid Date: Jul 01 2024
Alamosa, CO
Bid Date: Jul 03 2024
Alamosa, CO
--
Alamosa, CO
Bid Date: Jun 26 2024
Alamosa, CO
Bid Date: Jun 06 2024
Alamosa, CO
Bid Date: May 07 2024
Alamosa, CO
Bid Date: Jun 06 2024
Alamosa, CO
Bid Date: Apr 24 2024
Alamosa, CO
Bid Date: May 03 2024
Alamosa, CO
Bid Date: Apr 04 2024
Alamosa, CO
Bid Date: Apr 17 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.