BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a transportation facility in Pomeroy, Washington. Working plans call for site work for a transportation facility.

As of June 04, 2024, no bids received. The Port of Whitman County (Port) is requesting bids for 23-001-CF_Rail, Central Ferry Site F Rail in Whitman County, WA. The project will consist of the construction of new railway spurs that total approximately 1,417 lineal feet as noted on the plan sheets. Questions Due Date: May 15th 2024, 12:00 PM PDT Project Estimate: Schedule 1 $757,219 Schedule 2 $420,906 Total $1,178,125 SCOPE OF WORK The Port of Whitman County (Port) is requesting bids for 23-001-CF_Rail, Central Ferry Site F Rail in Whitman County, WA. The project will consist of the construction of new railway spurs that total approximately 1,417 lineal feet as noted on the plan sheet(s). Bidding and construction will be divided in two schedules. Schedule 1 is the Base Bid and will consist of the construction of approximately 880 lineal feet. Schedule 2 is the Additive Bid for an extension of the main line along the right of way of Central Ferry Rd. to the northeast, approximately 537 lineal feet of track. All labor and materials shall be included on the bid form as specified and shall conform in strength, quality of workmanship, and material to that which is specified. Any variance from the specifications or standards of quality must be clearly pointed out in writing by the bidder and approved by the Port. The Contractor shall furnish all additional materials and equipment required for the project. Work shall include all labor, equipment, tools, and all incidentals necessary to fully complete the work and installations as listed in the invitation to bid documents including: Grading and Earthwork Site Clearing Site Grading Cut/Fill Erosion Control, including cutoff ditches and silt fence Railway Construction Installing Subballast and Ballast Installing new track Installing 2 Number 9 Switches, Constructing 1 Concrete Road Crossing

Final Planning

Transportation Terminals

$1,178,125.00

Public - County

Site Work

10

3

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
5
Bidding Soon
90
All Active Projects
37
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 23, 2024

December 4, 2024

img_map_placeholder

393 Central Ferry Rd, Pomeroy, WA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.