BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Seattle, Washington. Completed plans call for site work for a water / sewer project.

This Project is located along NE 92nd Street to the east of 1st Ave NE. This Project consists of the following elements of Work: Installation of 330 LF of 12-inch diameter ductile iron storm, dram pipe, 5 new catch basins and 1 new inlet; installation of 515 LF of 8-inch DI-RJ water pipe. The Engineers Estimate for this Project is $919,000 (before sales tax). For purposes of the Inclusion Plan, this is considered a Underground type of project with a Past Performance of 18% WMBE utilization rates based on completed projects. For questions on the Inclusion Plan please contact Miguel Beltran at Miguel. beltran@seattle.gov or 206-684- 4525. Back-up contact is Carmen Kucinski at carmen.kucinski@seattle.gov or 206-684-0188. Bidders must understand the requirements of SMC 14,16 and RCW 49.46 and demonstrate compliance prior to Award. Question Deadline 05/30/2024 at 5:00 PM PT. Written questions must be submitted via email to Jessica.Guerrette@seattle.gov Contract Time (75 Working Days) Scope a) This Project includes Drainage Work and Water Main Work (1) The project drivers are upcoming SDOT paving work and current conditions of SPU drainage infrastructure. The water main replacement is included based on the proximity of drainage work. (2) Note that SDOT will come in after Physical Completion to install ADA curb ramps and permanent pavement. b) This Project consists of the following elements of Work including but not limited to: (1) Construction stormwater erosion control (2) Traffic control (3) Demolition and removals (4) Excavation (5) Installation of 330 LF of 12-inch diameter ductile iron restrained joint storm drain pipe, 5 new catch basins and 1 new inlet (6) Drainage lateral reconnections (7) Installation of temporary Water Main pipe (8) Installation of 515 LF of new 8-inch ductile iron restrained joint Water Main pipe (9) Assist SPU Water Operations with cut, cap and blocking for existing Water Main and with service transfers to temporary and new Water Mains (10) Temporary and final pavement over utility trenches (11) Televisions inspections (12) Final site restoration, including surface paving and pavement markings

Award

Water / Sewer

$992,000.00

Public - City

Site Work

14

19

3

Subscribe For Documents

61 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
49
Bidding Soon
936
All Active Projects
355
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2024

July 5, 2024

img_map_placeholder

NE 92nd St, Seattle, WA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.