Demolition, site work, renovation and addition to an educational facility in Williamsburg, Virginia. Completed plans call for the addition of a 6,500-square-foot, one-story above grade educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

This project consists of constructing a one-story building addition totaling approximately 6,500 S.F., at side of the existing Jamestown High School Cafeteria, within an existing outdoor courtyard. Limited exterior and interior alterations of the existing building are also included. Work includes clearing and demolition at the existing courtyard, preparation of building pad, grading and drainage, utility work, and restoration of the site. New construction includes a steel-framed, brick and EIFS-clad structure with windows and doors, HVAC and electrical work. The project includes two (2) additives, one for new bathrooms within the existing building, and a second option for an operable partition to subdivide the Addition internally The Specifications and Drawings prepared by Hudson + Associates Architects, PLLC are dated December 20, 2023. The civil drawings prepared by the Timmons Group There are two additive items included in the scope of work: Additive Item #1 - New Bathrooms: Construct two (2) new bathrooms within the existing school. It includes floor demolition, subgrade and above-grade plumbing, plumbing fixtures and piping, interior masonry partitions, floor patching, floor and wall finishes, toilet partitions and specialties, suspended ceiling, electrical power and lighting, and new mechanical exhaust. Additive Item #2 - Operable Partition Includes provision of an interior, manually operable partition that divides the new Addition into two spaces, including structural supports, upper wall and soffit construction, and enclosure walls where the partition system stacks. Services provided by the contractor shall include, but not be limited to the furnishing of all labor, materials, equipment, supervision, tools, traffic control, testing, transportation, and all other miscellaneous appurtenances and work necessary to complete the project in accordance with the Contract Documents, Drawings and Specifications The Contractor shall start construction as soon after NTP as practical, but not later than June 29, 2024. Substantial Completion - Base Bid (and Additive Bid Item #2, if awarded): May 23, 2025 Final Completion - Base Bid (and Additive Bid Item #2, if awarded): July 11, 2025 Additive Bid Item #1 - (If awarded) Commence on June 13, 2025, and achieve final completion on (or before) August 12, 2025 Bid Security in the amount of Five percent (5%) of the Bid shall be submitted with each Bid. Performance and Payment bonds for one hundred percent (100%) of the Contract will be required by the Owner prior to execution of the contract Each bid shall be accompanied by a Bidder's bond issued by a company authorized and licensed to transact business as surety in the Commonwealth of Virginia, a certified check Question Deadline 05/21/2024 at 2:00 PM ET All questions pertaining to this project should be directed to Jessica Yost, Senior Procurement Specialist in writing via e-mail: jessica.yost@jamescitycountyva.gov. A

Award

Educational

$2,795,000.00

Public - County

Addition, Demolition, Renovation, Site Work

86

36

17

4

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
189
Active Projects
69
Bidding Soon
1,360
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2024

June 29, 2024

Project location map

3751 John Tyler Hwy, Williamsburg, VA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.