Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a residential development in Danville, Virginia. Completed plans call for the renovation of a residential development.
Instructions: It is understood that our terms and conditions listed on back will apply to any order that may result from this solicitation. Note any exceptions for our consideration. F. O. B. Destination: It is the basic policy of the City to receive goods F. O. B.( free on board) Destination, which means that freight Quote Required By Send Quote To charges are paid by the seller who owns and assumes all risk for the goods until they are accepted at the designated delivery point. The cost of shipping the goods may be included in the quoted price or by the seller as a separate line item. Request for Quotes to install a new architectural shingle roof at 310 Holbrook Street ROOF, CHIMNEYS AND GUTTERS a. Tear off and discard metal " A" roof and front porch. DO NOT replace any EPDM that' s new. b. Install ALL new 7/ 16 O. S. B on " A" roof and the front porch. Plywood clips are not required if overlaying the plywood. c. Install painted metal roofing on the front porch with in-kind like material. d. Install snow guards on front porch roof. e. Install white aluminum drip edge on all roof edges. f. Install synthetic felt paper on the front porch roof only. Felt paper must be installed Horizontal not vertical. g. Install Ice and Water Shield at all eaves and rakes, in valleys, around chimneys for" A" roof and front porch. h. Install 15# roofing felt on the entire roof. Felt paper must be installed Horizontal not vertical. i. Install 30- year architectural fiberglass shingles, Class-A self-sealing roofing shingles on " A" roof. Include new flashing on all vents, chimneys, and valleys. j. Install 32 ft. of ridge vent ( Shingle over vent) on ridge of roof. Using a chalk line, strike a line on either side ofthe ridge board 7/ 8 of an inch down from the ridge board at the peak of the roof. If you have trusses, you should strike the chalk line such that it will create a gap 1- 3/ 4 inches across the peak when you get to the cutting step. k. Tear out and discard approx.: 300 LF gutter board/ soffitt/ fascia. 1. Install new gutter board/ soffit/ fascia 300 L.F. ( Match Existing) NOTE: Contractor shall verify roof and house size prior to bidding. Also: All roofs will be inspected for proper installation. Contractor is responsible for all permits. All work is to be done in a WORKMANLIKE manner. Work being done shall meet all existing State and Local Codes. All the exterior work on the house must match the original designed. SELECTIONS BY OWNER NOTE: All selections by owner shall be reviewed and approved, in advance, by the Community Development representative. The owner shall select the following items: Roof shingles color
Bid Results
Residential Subdivision
$17,540.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 21, 2024
June 20, 2024
310 Holbrook St, Danville, VA
Related To This Project
Danville, VA
Bid Date: Jun 04 2024
Danville, VA
Bid Date: Jun 05 2024
Danville, VA
Bid Date: Jun 06 2024
Danville, VA
Bid Date: May 23 2024
Danville, VA
Bid Date: Jun 11 2024
Danville, VA
Bid Date: Jun 11 2024
Danville, VA
Bid Date: Jun 17 2024
Danville, VA
Bid Date: Jul 09 2024
Danville, VA
Bid Date: Jun 03 2024
Danville, VA
Bid Date: May 29 2024
Danville, VA
Bid Date: May 07 2024
Danville, VA
Bid Date: May 13 2024
Danville, VA
Bid Date: May 02 2024
Danville, VA
Bid Date: Apr 26 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.