Published June 13, 2024 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Wyomissing, Pennsylvania. Completed plans call for site work for a water / sewer project.

This work will include the replacement of 1060 LF of 10" DIP water main on Old Mill Road and 875 LF of 6" DIP water main on Oriole Road. There are about 18 water service lines that should be connected to the new main. The work shall include connections to all existing water lines. The work also includes the installation of new service laterals and valves from two fire hydrants. 45- degree fittings and other fittings will be required to go under or over all existing utilities. The trenched area will be milled and overlaid for about 1,200 SY for paving restoration. Bidders must conform to the Pennsylvania Prevailing Wage Act since the estimated construction costs of the project exceed $25,000. All Requests for Information shall be submitted online by 12:00 pm on June 3rd The bid must be accompanied by a Cashier's Check, Certified Check, or Bid Bond in the amount of Ten Percent (10%) of the bid, made payable to Wyomissing Borough. Also required are a properly executed Bid Form, Non-Collusion Affidavit, Certification Statement, and Contractor's Qualification Statement. The successful bidder shall also be required to provide a Performance Bond in the amount of one hundred percent (100%) of the Contract amount within ten (10) calendar days of written notice of acceptance of the Bid. The Borough reserves the right to reject any or all proposals or to accept any portion of any bid, waiving any defects, errors, omissions, irregularities, or informalities in the bid The Work consists of the following: 1. The Work includes construction of a water main replacement

Bid Results

Water / Sewer

$387,450.00

Public - City

Site Work

9

10

14

5

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Trenching, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Earthwork Methods, Soil Treatment, Rodent Control, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
284
Active Projects
152
Bidding Soon
2,260
All Active Projects
1,070
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2024

July 11, 2024

img_map_placeholder

Multiple Locations, Wyomissing, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2024 Water Main Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.