BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Apex, North Carolina. Conceptual plans call for site work for a water / sewer project.

Engineering, Project Management, and Related Professional Services for Marblehead Dam Repairs, Willow Run Msd. Question Deadline 06/05/2024 at 5:00 PM ET Questions must be submitted by Responses to questions may result in the issuance of addenda to the RFQ, and any addenda will be posted no later than June 7, 2024 at online. It is the responsibility of all Respondents to check the website for addenda prior to submission. No questions will be answered after the date specified. Purpose of RFQ The Town of Lewisville, North Carolina (Town) invites the submittal of responses to this Request for Qualifications (RFQ) from firms qualified in the State of North Carolina to perform engineering, structural analysis, and related professional services specific to earthen dam construction and repair. The project to be designed is called Marblehead Dam Repair and is located in the Willow Run Municipal Service District (access gate 1912 Pinehurst Drive, 3603'47.6N 802614.5"W) Scope of Work In September 2023, seepage was found in a large area on the downstream slope side of the Low Hazard Marblehead Dam. Through an initial process of site surveying and geotechnical subsurface investigation by a licensed engineering firm, it was determined that the seepage does not need emergency action but does require mitigation. Conceptual design drawings and a preliminary construction cost estimate were prepared in order to allow the Town of Lewisville to initiate a funding mechanism for the project. This RFQ will determine which engineering firm designs and oversees the actual repair process. The successful firm will be contracted to perform design development, construction documents, and contract administration phases. Within each phase, there will be ancillary tasks including, but not limited to, permitting, bid assistance, construction observation, and other usual and customary tasks required of a professional engineering firm to take a project of this type from the end of the conceptual planning phase through design to final completion and close-out of the construction project. Time is of the essence and strong consideration will be given to the prospective firm's proposed timeline. The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

$848,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
45
Bidding Soon
1,223
All Active Projects
506
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.