Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 22, 2025 at 8:00 PM
Updated May 23, 2025
Site work for a water / sewer project in Milwaukee, Wisconsin. Conceptual plans call for site work for a water / sewer project.
Update: The purpose of this project is to investigate the South Shore Force Main pipe to determine the condition of the force main and perform necessary rehabilitation as needed. The force main was installed in the 1980s and had never been inspected. The project scope includes an investigation of pipe wall thickness, assessment of rates of corrosion or other forms of degradation of pipe strength, and recommendations of actions to be taken. Based on the investigations and condition assessment, the project includes the design and construction to rehabilitate the force main to provide additional service life. No significant impact to the operating budget is expected. Project is included Milwaukee Metropolitan Sewerage District Fiscal Year 2024-2034 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- The purpose of this project is to investigate the South Shore Force Main pipe to determine the condition of the force main and perform necessary rehabilitation as needed. The force main was installed in the 1980s and had never been inspected. The project scope includes an investigation of pipe wall thickness, assessment of rates of corrosion or other forms of degradation of pipe strength, and recommendations of actions to be taken. Based on the investigations and condition assessment, the project includes the design and construction to rehabilitate the force main to provide additional service life. No significant impact to the operating budget is expected. The project is include in the county 2024 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Water / Sewer
$1,743,269.00
Public - County
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 1, 2027
S Shore Dr, Milwaukee, WI
Related To This Project
Milwaukee, WI
Bid Date: Jul 09 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
