Published May 12, 2025 at 8:00 PM

Updated May 13, 2025

Site work and paving for a sidewalk / parking lot in Northbrook, Illinois. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Update: The Village of Northbrook plans to resurface Walters Avenue in FY 2027 in conjunction with Surface Transportation Program (STP) grant funds the Village has received. As part of the planning for that work the water main on Walters Avenue has been identified for replacement and the Village's Master Bicycle and Pedestrian Plan (MBPP) identifies Walters Avenue for separated bike lanes. An initial review of the bike/pedestrian improvements was conducted and an open house was held in April 2023 for the Public. The PBC has recommended moving forward with Phase I preliminary engineering of conventional bike lanes along the corridor. Preliminary engineering is underway and will be completed in FY 2026 before a determination of what if any bike and pedestrian improvements are included in the final design and scope of the project. Project is included Village of Northbrook Fiscal Year 2026-2030 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- The Village of Northbrook plans to resurface Walters Avenue in FY 2027/2028. As part of the Village's implementation of the Master Bicycle and Pedestrian Plan (MBPP), the Village seeks to implement bicycle facilities on Walters Avenue between Pfingsten Road and Shermer Road. The Pedestrian and Bicycle Commission (PBC) and Village staff engaged a consultant to explore bicycle and pedestrian improvement options along this corridor. An open house was held in April 2023 and feedback was provided. The PBC recommends moving forward with Phase I preliminary engineering of conventional bike lanes along the corridor. The Village will begin Phase 1 design engineering in FY 2024/2025 and complete design engineering in FY 2025/2026. If approved by the Village Board, Construction is scheduled for FY 2027/2028 to coincide with the Walters Avenue rehabilitation project. The project is include in the City's 2025-2029 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Sidewalks / Parking Lot

$1,889,384.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
515
Active Projects
287
Bidding Soon
3,683
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 1, 2028

Project location map

Walters Ave, Northbrook, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.