BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Tipp City, Ohio. Completed plans call for the renovation of a educational facility.

Interior Modifications to add five new classrooms, enclose a Technology closet, and enclose an Electrical closet where the school's Media Center and Stage currently occupies. Modifications include select demolition of interior modular walls, ceilings, and finishes. Modifications will also include construction of new walls, ceilings, doors, and interior finishes. A Bid Security in the form of a certified check, cashier's check, irrevocable letter of credit, or surety company bond pursuant to Chapter 1305 of the Ohio Revised code in the amount of 10% of the total bid shall accompany each bid; or a bid guaranty bond in accordance with Chapter 153.571 of the Ohio Revised Code in the amount of 100% of the total bid shall accompany each bid. The Owner reserves the right to reject any or all bids and to waive informalities, irregularities and/or errors in the bids to the extent permitted by law. This includes the right to extend the date and time for receipt of bids. PROJECT SCOPES OF WORK General Construction: Interior Modifications to add five new classrooms, enclose a Technology closet, and enclose an Electrical closet where the school's Media Center and Stage currently occupies. Modifications include select demolition of interior modular walls, ceilings, and finishes. Modifications will also include construction of new walls, ceilings, doors, and interior finishes. Site Work: None Fire Protection Work: None Plumbing Work: None HVAC Work: None Electrical Work: Includes but is not limited to: Selective demolition of existing lights, light switches, and receptacles. Provide new lights, light switches, receptacles, and technology rough-ins, using surface raceway only where necessary. Relocate existing fire alarm devices as noted on the drawings. Modify and extend existing circuits to include this work. This work is to be bid as Alternate #01. Refer to section 01 23 00 ALTERNATES for more information. Technology Work: Includes but is not limited to: Providing new classroom data cabling, jacks and faceplates, cabling for new WAP . Reinstallation of existing Technology Racks onto new wall at the same location as existing

Award

Educational

$201,635.00

Public - City

Renovation

20

16

7

3

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
58
Bidding Soon
1,323
All Active Projects
604
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.