BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Packwood, Iowa. Completed plans call for site work for a educational facility.

Concrete Projects. The Contractor Must Have a Purchasing Agent Authorization Letter and an Exemption Certificate From the Public Entity to Present to the Retailer, Which Specifies the Construction Project and Will Be Available for That Project Only. Pekin Community School District Will Issue an Authorization Letter and an Exemption Certificate to the Contractor and/or Subcontractors for the Purchase or Use of Building Materials, Supplies, and Equipment to Be Used on This Project Only. The Site Will Be Available Starting June 11, 2024 for Commencement of Work. The General Nature of the Work is as Follows: the Project Site is Located at Pekin Community School, 1062 Birch Avenue, in Rural Packwood, Iowa. Project Will Be Bid for 2 Separate Items 1. Remove and Repair 200 Feet of 5-footwide Sidewalk, 4 Inches Thick. (West Side of Field/home Side) Tear Out and Replace 200 Feet of 8-inchthick, 4-foot-tall Retaining Wall (West Side of Field/home Side). 2. Construct 229 Feet of Sidewalk, 5-footwide, 4 Inches Thick (East Side of Field/visitor's Side). Tear Out and Replace a 20-foot X 10-foot Cement Pad, Located Under the Current Bleachers. Bleachers Will Be Removed by Owner Before the Project Begins. In Addition, Construct 2 - New Concrete Pads 1 - 53-foot X 9 Foot, 1- 32-foot X 13 Foot, Both 4 Inches Thick. Do Not Include Sales Tax on Your Bid Form. No Bid May Be Withdrawn for a Period of 30 Days After the Date of the Scheduled Closing Time for the Receipt of Bids. Bidders Shall Be Prepared to Submit a Performance Bond and Payment Bond Conditioned on the Faithful Performance of the Contract. Out-of-state Bidders Shall Be Prepared to Submit an Out of State Contractor Bond to the Iowa Division of Labor in Accordance With Chapter 91c of the Code of Iowa. By Virtue of Statutory Authority, a Preference Will Be Given to Products and Provisions Grown and Coal Produced Within the State of Iowa, and to Iowa Labor to the Extent Lawfully Required Under Iowa Law. The Owner Reserves the Right to Accept or Reject Any or All Bids and Waive Informalities in Bidding. Substantial completion by August 1, 2024. Final completion by August 16, 2024. Remove and repair sidewalk, construct sidewalk, remove and replace concrete, repair retaining wall, construct concrete pads

Post-Bid

Educational

$20,000.00

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
33
Bidding Soon
680
All Active Projects
236
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 7, 2024

June 11, 2024

August 16, 2024

img_map_placeholder

To Be Determined, Packwood, IA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.