BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Kingston, Ontario. Contact the soliciting agency for additional information.

Reference Number cb-31-66687326 The following is a summary of the statement of work for this requirement. The Correctional Service Canada (CSC) is required by law to ensure that fire protection services are up to date with accurate reporting measures taken. CSC requires the services of an experienced third-party Contractor to ensure CSC is compliant with health and safety requirements for Kingston Penitentiary. Objectives: To perform annual fire alarm inspection, periodic sprinkler inspections, and the annual fire hydrant flow tests at Kingston Penitentiary as required under federal, provincial, and municipal legislation. Deliverables: The Contractor must complete: 1 Annual Fire Alarm Inspection and provide report each year for 3 years. 1 Semi Annual Sprinkler Inspection and provide report each year for 3 years. 1 Annual Sprinkler Inspection and provide report each year for 3 years. 1 Annual Fire Hydrant Flow Test for 12 units and provide report each year for 3 years. The Contractor must supply all labour, material and equipment required to perform the following: fire system inspections and testing in accordance with CAN/ULC-S536 of the fire alarm systems, including 100% of connected devices, control units, standby batteries and remote monitoring connections in each building as identified in schedule below. sprinkler system inspections and testing in accordance with NFPA 25, including flow, tamper, pressure, switches, wet, dry, standpipe, and backflow. Excluded from the inspection: The fire hose cabinets and hoses. fire hydrant inspection and flow test in accordance with NFPA 25. The Contractor must have all industry regulated testing and certifications completed at the Contractors expense. The Contractor must supply all labour or mechanical devices, or both, required to complete the inspections. The Contractor must ensure that all fire system, sprinkler system, and fire hydrants are left in working order at the end of the contractors workday. If the Contractor cannot leave a system in working order, the contractor must notify the project authority before the contractor leaves the site, and the contactor must ensure that there are alternative arrangements in place for any affected systems. Fire Alarm System: The Contractor must communicate and coordinate work performed with Johnson Controls (Tyco), the OEM proprietary rights holder of the Fire Alarm System and Simplex parts. Note: The main panel is located in the Sally Port. There are various panels in the institution that connect to the main panel. Further information regarding the Fire Alarm System is detailed in the latest annual fire inspection report(s) that CSC will provide at the mandatory site visit. Fire Hydrant Inspection and Flow Test: There are 12 fire hydrants on site at Kingston Penitentiary.

Post-Bid

Jails / Prisons

Public - Federal

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
28
Bidding Soon
530
All Active Projects
226
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 11, 2024

August 12, 2024

img_map_placeholder

560 King St W, Kingston, ON

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.