EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 25, 2024 at 8:00 PM

Updated October 1, 2024

Site work and renovation of an educational facility in Salt Lake City, Utah. Working plans call for the renovation of a educational facility.

Scope: Demo & Replace (2) Sets of existing Stairs and Handrails on the South side of 295 Chipeta Entrance. Also prep and Crack seal entire sidewalk from East parking garage to Chipeta Way per plan. PLEASE NOTE: - BID BOND IS NOT REQUIRED - PAYMENT AND PERFORMANCE BOND MAY BE REQUIRED IF BID IS $100K OR HIGHER. Project Budget $25,000 - $100,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Educational

$100,000.00

Public - State/Provincial

Renovation, Site Work

10

5

2

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Applied Fireproofing
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Fixtures
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
44
Bidding Soon
588
All Active Projects
336
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 12, 2024

December 25, 2024

img_map_placeholder

295 Chipeta Way, Salt Lake City, UT

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

295 Front Stairs Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.