Site work for a swimming pool in Fernandina Beach, Florida. Completed plans call for site work for a swimming pool.

MLK Recreation Center Pool Resurfacing located at 1200 Elm Street, Fernandina Beach, FL 32034. Any questions regarding the City's Bid requirements or process can be directed in writing to Wanda Weaks, Purchasing Agent at wweaks@fbfl.org. The work shall include furnishing all labor, materials and equipment for the proper resurfacing of the main pool located at 1200 Elm Street, Fernandina Beach, Florida. The work includes, but is not limited to, the following: MLK RECREATION CENTER POOL The measurements from outside of the pool. 57’L x 26’W: 2,312 sq ft. Addition of stairs: 138 sq ft / Total Measurement: 2450 sq ft. (close estimation) 1. Obtain all required permits. 2. Make contact with the Health Department. 3. Remove existing marcite finish exposing painted substrate. 4. Sand blast using black beauty aggregate to expose substrate below. Protect stainless gutter system with 10mm or thicker material. Protect or remove stainless ladders and handrails. 5. Sound out exposed substrate and remove all loose or hollow sounding areas. 6. Block in areas where original plaster/aggregate was removed using Type II Portland cement and sand. 7. Prior to block-in treat substrate with SGM Bond Kote. 8. After block-in apply Bond Kote on entire pool substrate within two days of final finish plastering. 9. Add non-skid tile to steps to meet new HRS riser tile code. 10. Provide dewatering as required. 11. Replace all plastic interior parts with new. Maintain vacuum port. Replace main drains with new grates and frames. The main drain grates/covers shall be replaced with those that meet the requirements of the Virginia Graham Baker Act Specifications, ASME/ANSI A112.19.8-2007 performance standard, “Suction Fittings for Use in Swimming Pools, Wading Pools, Spas, and Hot Tubs”. Meet or exceed all Federal and State codes effective at the time of work including flow requirements. All work must comply with the Model Aquatic Health Code (MAHC). 12. Maintain wall anchors for lap lines and safety lines. 13. Maintain handrails and ladders. 14. Maintain or replace black tile on safety line. 15. ID all return inlets on gutter system with temporary marker tape. 16. Reseal stainless steel gutter at gutter/shell intersection. 17. Replastering is to be completed in one day. 18. Apply exposed quartz aggregate pool finish or permitted substitute to entire surface of pool. Start filling the pool within a 24-hour period. 19. Expose aggregate by means of acid washing within 15 hours of final trowel. Neutralize and remove water prior to filling. 20. All materials shall be mixed with and applied with the proper equipment. 21. Finisher mechanic ratio shall not exceed 300 square feet per finisher. 22. All finishers shall have previous trade experience. 23. Use sequestering agent at refilling. 24. Contractor shall carry pool popping insurance minimum. 25. Contractor shall have on site a dumpster large enough for all construction debris removal. 26. Perform initial chemical start up and pool cleaning upon completion. The Contractor shall achieve Final Completion of the work not later than thirty (30) days after reaching Substantial Completion.

Bid Results

Swimming Pools

$77,035.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
38
Bidding Soon
602
All Active Projects
232
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2024

August 12, 2024

img_map_placeholder

1200 Elm St, Fernandina Beach, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.