BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Ridgway, Colorado. Completed plans call for the renovation of a municipal facility.

Remove approximately 328 yards of carpet and reinstall carpet "tiles" in all offices and common areas of the Facility. 2. Removal and re-installation of any baseboard trim needed to facilitate carpet removal / installation. 3. Disposal of existing carpet. 4. Indicate additional hourly rate for any unforeseen floor prep that may be required. 5. Pricing and Warranty information on commercial, medium grade carpet tiles, including any materials, adhesives and carpet sundries to complete installation. 6. Removal and installation to be performed in multiple stages with the first stage beginning on a Thursday through Sunday to allow for County staff to remove office furnishings in phases to keep office disruption to a minimum, and create space for the next phase for the following weekend. Multiple visits may be required to accommodate this approach. 7. Ouray County is selecting the use of direct adhesive carpet tiles or squares as opposed to rolls of carpet. The individual squares allow for a phased installation, avoid the need for carpet stretching and seams, and any tiles that may get damaged in the future can easily be replaced. Ouray County reserves the right to reject any and all proposals, to waive any and all informalities, or to accept the proposal that best serves the interest of the County, and the right to disregard all nonconforming, non-responsive, or conditional proposals

Post-Bid

Municipal

$100,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
6
Bidding Soon
120
All Active Projects
42
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 8, 2024

August 7, 2024

img_map_placeholder

111 Mall Rd, Ridgway, CO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.